Lync WQ-UV
SECTION 3: Operation
L- OMM-006_0A
•
1/26/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
8
of
38
3.
Installation and Operation
3.1.
Pre-Installation Considerations
Unpack the crate and make sure all components are accounted for according to the table below
for each specific model. If any components are missing or damaged contact your Lync
representative. If they cannot be reached contact Lync customer service at 1-800-433-5654.
Component
Shipped
Loose
Pre-
installed
Quantity
WQUV-050-D WQUV-100-D
Lync Cartridge Housing (LCH-150)
X
1
1
Lync UV System (LD050AGAA)
X
1
2
Filter Cartridge (LCB-150-P5)
X
1
1
Piping Headers
X
1
1
UV Sensor
X
1
2
Extra Filter Cartridge (LCB-150-P5)
X
1
1
UV Quartz Sleeve
X
1
2
UV Lamp
X
1
2
2” Inlet Flange
X
1
1
2” Gasket/Bolt kit
X
1
1
Quartz Sleeve O-Ring
X
1
2
3.2.
Installation
Lync WQ-UV is a complete system with factory pre-assembled plumbing and wiring to minimize
installation time and labor. Components are fastened onto a steel skid for safe and easy
transportation and installation.
1. Confirm that the system being installed matches the flow rate for the application.
2. WQ-UV system should be installed as close as possible to the treated water's point of
use.
3. Position the system in a suitable location with 48 inches of space allowance around the
system to allow for the maintenance. Allow 48 inches of overhead clearance for the
removal of lamp and quartz sleeve.
4. Responsibility for meeting local electrical and plumbing codes lies with the
owner/operator.
5. Install indoors in an area protected from freezing.
NOTES:
•
DO NOT install the system near any source of heat. Also, DO NOT install the system
near any device or break out area that would be adversely effected by water.
•
DO NOT install this system higher in elevation than 10,000 feet above sea level.
•
DO NOT install where system is exposed to harsh chemicals or may be subjected to
being struck by moving equipment, carts, mops or any other item that may cause
damage.