background image

ES-A-ACV-LF920GD  2115

Issue

Possible Cause

Corrective Action

Notes

Main Valve will not 
open

Closed isolation valves in pilot system.

Check isolation valves, ensure 
open. 

Insufficient supply pressure.

Check upstream pressure.

Depending on water 
source, supply pressure 
may not be controlled by 
valve operator.

Main valve stem assembly corroded/
damaged.

Inspect stem assembly, clean/
replace if necessary.

Blockage in pilot system.

Inspect & clean any installed 
pilot system strainers, check 
orifice/speed controls for 
blockages.

Missing fixed orifice assembly.

Verify installation of orifice; 
replace if required/missing. 

Pilot valve inlet isolation 
valve can be used as a 
makeshift orifice assembly 
by partially opening from 
full closed position. 

Improperly configured opening speed 
control (if equipped). 

Adjust opening speed control 
to verify functionality, adjust as 
required.

Standard setting for  
opening speed control is 
1

 

1/2

 - 2

 

1/2

 turns open from 

full closed position. Can 
be adjusted in field. 

Main Valve will not 
close

Closed isolation valves in pilot system

Check isolation valves, ensure 
open. 

Diaphragm is damaged

Conduct diaphragm seal test, 
repair and replace if necessary. 

Main valve stem assembly corroded/
damaged.

Inspect stem assembly, clean/
replace if necessary.

Blockage in main valve.

Perform freedom of movement  
test; if valve does not close,  
disassemble and remove  
blockage.

Worn/damaged valve seat. 

Perform seat sealing check; 
disassemble and inspect/repair 
seat if required.

 

18

 

Troubleshooting Guide

 

© 2021 Watts

Installation, Operation and Maintenance - Series LF920GD 

Содержание AMES LF920GD Series

Страница 1: ...ed contractor in accordance with local codes and ordinances WARNING Need for Periodic Inspection Maintenance This product must be tested periodically in compliance with local codes but at least once p...

Страница 2: ...ustable setpoint It is controlled by a normally closed control pilot designed to 1 Open allowing fluid out of the main valve cover chamber when upstream pressure is above the adjustable setpoint and 2...

Страница 3: ...0GD This Ames Automatic Control Valve ACV is a full port single chamber basic valve that incorporates a one piece disc and dia phragm assembly This assembly is the only moving part within the valve al...

Страница 4: ...530 1945 Pressure Drop psi 2 3 4 6 8 10 20 30 40 60 80 100 Flow Rate Gallons per minute Water 2 4 10 20 40 60 80 100 200 500 1000 2000 5000 10000 20000 100000 8 6 4 8 1 0 1 2 1 4 1 6 6 2 1 1 2 3 8 1 0...

Страница 5: ...l 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron...

Страница 6: ...e NPT Port Size NPT Shipping Weights A B C D E F G H I J K L in in mm in mm in mm in mm in mm in mm in mm in mm in mm in mm in in lbs kgs 11 4 71 4 184 51 2 140 3 8 1 4 20 9 11 2 71 4 184 81 2 216 51...

Страница 7: ...Turning the adjustment screw counterclockwise lowers the control setpoint The LFPV20C is equipped with one 1 2 NPT inlet and outlet port and a 1 4 NPT side sensing port located on the power chamber Th...

Страница 8: ...he free flow direction the seat moves out of the flow path to all unrestricted flow Specifications Model LFFC FLOW CLOSED Fluid Speed Controlled by Needle FLOW OPEN Free Flow Seat Full Open FLOW CLOSE...

Страница 9: ...e used in pilot lines to provide a positive shutoff in any override or maintenance situation for simple trouble shooting This 2 piece full port valve features bottom loaded stems PTFE seats and packin...

Страница 10: ...r Size 1 4 3 4 NPT Model LF60 Flo Clean Strainers are used to filter the fluid pass ing through the pilot circuit and provide protection to pilot circuit speed controls and pilots It is installed in t...

Страница 11: ...ols and pilots The filter element can be accessed for cleaning by removing the clean out cap or may be cleaned by installing an optional blow down ball valve The wetted surface of this product contact...

Страница 12: ...rated test cock installed on the top of the Model 50 housing provides a controlled method of removal of air from the cover chamber during start up or troubleshooting of the Main Valve Valve Size in Di...

Страница 13: ...e trip arm when the main valve is closed The collar can be positioned on the stem by loosening the set screw to actuate the switch at the desired point of valve travel Body Material Stainless Steel El...

Страница 14: ...service in a controlled manner to protect the system from damaging over pressure 1 Clear the line free of slag and other debris 2 Install the valve so that the FLOW ARROW marked on the valve body tag...

Страница 15: ...and Closing Speed Turn the adjustment screws on the Closing Speed and Opening Speed Controls if the main valve is so equipped OUT counterclockwise 11 2 to 21 2 turns from full closed position STEP 2 T...

Страница 16: ...closing IF INSTALLED Opening Speed Flow Control Adjustment The Opening speed flow control allows free flow into the cover and re stricted flow out of the cover of the main valve If recovery of pres su...

Страница 17: ...valve specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace di...

Страница 18: ...sembly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting f...

Страница 19: ...require a lifting eye bolt to be installed in the valve stem accessory threads located on the very top of the valve stem 5 Before removing Stem Nut examine stem threads for mineral build up Remove dep...

Страница 20: ...ern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrity of the Seat Seal by...

Страница 21: ...her costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company ha...

Отзывы: