BMK1.5 LN Boiler 24-Month Maintenance Kit #58025-05 Instructions
Technical Instruction Document
TID-0066_0B
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, New York 10913
•
Phone: 800-526-0288
7.
FINAL REASSEMBLY AND TESTING
Upon completion of all inspections and component replacement, reassemble the unit and
perform the tests specified in paragraphs 7.1 and 7.2.
7.1 Set-Up and Reassembly After Maintenance
Following completion of the all required inspections and replacements, perform the following
reassembly and setup procedures:
Setup and Reassembly After Maintenance Instructions
1. Ensure that the heat exchanger has been filled and the water supply and return valves
have been opened.
2. Turn ON the external circuit breaker to the unit.
3. At the front panel of the unit, set the
ON/OFF
switch on the C-More Control Panel to the
ON
position.
4. Press the
LOW WATER LEVEL RESET
button to reset the low water cutoff.
5. Press the
CLEAR
switch to reset the fault relay. This will turn off the
FAULT
LED and clear
any displayed error message.
6. Replace the unit side panels and top panels.
7.2 Final Testing After Maintenance
Upon completion of the inspections and replacements specified in this Technical Service
Bulletin, perform the Combustion Calibration Tests specified in Chapter 4 of the O & M Manual
GF-120, GF-120M (Massachusetts only), or GF-121 (Dual-Fuel).
Following successful completion of the Combustion Calibration Tests, return the Benchmark
1.5LN Boiler to service use.