3
When you unpack your pump
3.1
Unpacking your pump
Unpack all parts carefully, retaining the packaging until you are sure all components are present and in
good order. Check against the components supplied list, below.
3.2
Packaging disposal
Dispose of packaging materials safely, and in accordance with regulations in your area. The outer carton
is made of corrugated cardboard and can be recycled.
3.3
Inspection
Check that all components are present. Inspect components for damage in transit. If anything is missing
or damaged, contact your distributor immediately.
3.4
Components supplied
630 Components
l
630 pump drive unit, fitted with 620R or other pumphead if specified as a pump
l
The designated power cable (attached to the pump drive unit)
l
A 630N module providing pump ingress protection to IP66, NEMA 4X. if a BpN.
l
Note:
the module is attached for transit, but must be removed to allow wiring up, voltage selection
and fuse inspection and then re-affixed before the pump is operated.
l
Product safety information booklet incorporating quick start manual
3.5
Storage
This product has an extended shelf life. However, care should be taken after storage to ensure that all
parts function correctly. Please observe the storage recommendations and use-by dates which apply to
tubing you may wish to bring into service after storage.
m-630bpn-en-08
7
Содержание 630 Bp
Страница 21: ...1 2 m 630bpn en 08 21...
Страница 46: ...14 7 Network topology Star network Ring network 46 m 630bpn en 08...
Страница 105: ...22 5 Flow Sensor Reading The flow sensor value can be read via the Flow sensor reading screen m 630bpn en 08 105...
Страница 107: ...Press SELECT to choose an option Press EXIT to return to the screen from where the MENU was called m 630bpn en 08 107...
Страница 130: ...24 Help 24 1 Help Select Help from the main menu to access the help screens 130 m 630bpn en 08...
Страница 150: ...Number Spare Description 8 TT0005 10mm 3 8in spanner 9 MRA3026A Track assembly 150 m 630bpn en 08...