These guidelines have been prepared for the professional contractor to aid in the installation of: 
UNIVERSAL 1/2" THERMOSTATIC VALVE STYLE NO. GUTH56, GU56TH (UK) 
All dimensions are based on original specification and are subject to change and variation. 
Please consult your Design Associate for current specifications. 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Style No.

   

GUTH56† 

Code No.

   GUSV56R 

 

SPECIFICATIONS: 

Fitting Hole Diameter 

Ø4-1/2" (Ø 114mm)* 

Inlet/Outlet Connection 
Size & Type: 

1/2" Female NPT† 

Recommended Water 
Pressure: 

45 psi (3 Bar) 

Unrestricted Maximum 
Flow Rate: 

7gpm @ 45 psi 
(26 L/min @ 3 Bar) 

Valve Material: 

Wax Element 

Water Pressure: 

20 psi MIN - 80psi MAX 
(1.4 Bar Min - 5.5 Bar Max) 

* Ø4-1/2" (Ø 114mm) hole is required for servicing. 
 
† UK Style No. GU56TH supplied with 4 BSP Adapters, 
assembly required.  
 
IMPORTANT: 
 

¾

 

To ensure this product is installed properly, you 
must read and follow these guidelines. 
 

¾

 

The owner/user of this product must keep this 
information for future reference.  
 

¾

 

This valve includes integrated service stops. Make 
sure the tile guard is in place.  
 

¾

 

This valve features anti-scald protection. The risk of 
scalding exists until the installer had properly 
calibrated/adjusted the temperature setting during 
final trim installation. 
 

¾

 

This product must be installed by a professional 
licensed contractor. 

¾

 

Check local building and plumbing codes to ensure 
that your installation conforms to all applicable 
requirements. In the State of Massachusetts, all 
installations must comply with the rules and 
regulations set forth within 248 CMR.   

 

¾

 

Supply fittings are designed in accordance with 
pressure and temperature ratings specified in ASME 
A112.18.1/B125. 

¾

 

DO NOT APPLY DIRECT HEAT TO THE VALVE. Pre-
solder any connections to prevent damage to the 
cartridge and service stop seals.  
 

¾

 

The trim should be on-site prior to rough in and 
allows the installer to visualize the installation. 
 

¾

 

This thermostatic valve only mixes hot and cold 
water and does not have volume control or shut off 
capability.  A diverter or wall valves (SOLD 
SEPARATELY) control on/off/volume and must be 
installed for each fitting that will have water flowing 
to it. This valve cannot be used with a diverting tub 
spout. 
 

¾

 

Insure that the hot and cold supply lines are 
connected to the valve according to the markings 
on the valve body: NO INVERSE CARTRIDGE IS 
AVAILABLE. 
 

¾

 

Inspect this product to assure you have all parts 
shown that are required for proper installation. 
 

¾

 

Check incoming water pressure.  
 

¾

 

If valve is going to remain unused for an extended 
period of time (over 3 months), then the water to 
the valve should be shut off (via service stops or 
system control valve) and the volume control valves 
should be opened to allow the water in the 
thermostatic valve to evaporate. This is to keep the 
cartridge from being exposed to stagnant or hard 
water, which can cause the valve to malfunction.  
 

¾

 

It is recommended to flush the supply lines prior to 
valve installation.  

 
ROUGH-IN: 
 
1.

 

Remove TILE GUARD from VALVE BODY by 
unthreading the SCREWS, as shown in Figure - 01.  

 

VALVE

BODY

TILE

GUARD

SCREWS

VALVE

BODY

TILE

GUARD

SCREWS

 

FIGURE - 01 

 

2.

 

Make sure the valve body is positioned according to 
valve markings so the inlets are situated with hot 
piped on the left and cold piped on the right. Turn 
the service stops to the right to close and to the left 
to open. See Figure - 02.  