3 Changing the Mode of Operation
58
March 14, 2014, 715004387 Rev. B
ESI mode
The following sections explain how to install and remove an ESI probe. For
further details on running ESI applications, see
Installing the ESI probe
Required material
Chemical-resistant, powder-free gloves
To install the ESI probe:
1. Prepare the instrument for installing the probe according to the
“Preparing the instrument for operations on or
2. Remove the protective sleeve, if fitted, from the ESI probe tip.
Warning:
To avoid personal contamination with biohazards or
toxic materials, and to avoid spreading contamination to
uncontaminated surfaces, wear clean, chemical-resistant,
powder-free gloves while performing this procedure. The LC
system connections, ESI probe, and source can be contaminated.
Warning:
To avoid electric shock, before beginning this procedure,
prepare the instrument according to the procedure on
,
“Preparing the instrument for operations on or inside its source”
.
Warning:
To avoid puncture wounds, handle the ESI probe with
care; the probe tip is sharp.
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...