![Waters Xevo TQD Скачать руководство пользователя страница 55](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421055.webp)
Leaving the mass spectrometer ready for operation
March 14, 2014, 715004387 Rev. B
55
3. Remove the PEEK tubing from the reset button aperture.
4. Wait until the reboot sequence ends before starting the mass
spectrometer software.
Tip:
An audible alert sounds when the reboot sequence is complete.
Leaving the mass spectrometer ready for operation
Leave the mass spectrometer in Operate mode except in the following cases:
•
When performing routine maintenance
•
When changing the source
•
When leaving the mass spectrometer unused for a long period
In these instances, put the mass spectrometer in Standby mode. See the
online Help for details.
Emergency shutdown of the mass spectrometer
To shut down the instrument in an emergency:
1. Operate the power button on the front of the instrument.
2. Disconnect the power cable from the instrument’s rear panel.
Warning:
To avoid electric shock, isolate the instrument observing the
procedure outlined below. The instrument’s power switch does not
isolate it from the main power supply.
Notice:
To avoid losing data, reboot the instrument as described on
. Data can be lost when you perform an emergency shutdown.
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...