
Preparing the instrument for working on the source
4-7
Preparing the instrument for working on the source
For safety reasons, you must follow the procedure described below before
working on the source (for example, when operating the source isolation
valve).
To prepare the instrument for working on the source
1. In the Instrument Console, click Stop Flow
to stop the LC flow or, if
column flow is required, divert the LC flow to waste as follows:
a. In the Instrument Console system tree, expand Xevo TQ MS
Detector, Interactive Fluidics.
b. Click Control
.
c.
Select Waste as the flow state.
2. In the Instrument Console, click Standby
, and confirm that the
Operate indicator is not illuminated.
3. Wait 3 minutes to allow the desolvation gas flow to cool the probe and
source.
4. In the Instrument Console, click API
to stop the desolvation gas
flow.
Содержание Xevo TQ MS
Страница 10: ...x...
Страница 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Страница 129: ...Replacing the air filter 4 81...
Страница 130: ...4 82 Maintenance Procedures...
Страница 146: ...B 4 Materials of Construction and Compliant Solvents...
Страница 178: ...D 4 Plumbing the IntelliStart Fluidics system...