
Connecting the Edwards oil-free roughing pump
C-9
•
12.7-mm clear PVC exhaust tubing (included in the Waters Rotary
Pump Kit)
•
PVC hose clamps (included in the Waters Rotary Pump Kit)
•
1-inch ID vacuum hose (included in the Waters Rotary Pump Kit)
To connect the oil-free roughing pump
.
1. Place the pump on the floor, within 1.5 m (5 feet) of the instrument.
Warning:
The pump and its connections can be
contaminated with biohazardous and/or toxic materials.
Always wear chemical-resistant, powder-free gloves when
performing this procedure.
Caution:
• To ensure correct operation of the roughing pump, install it
within 1 degree of horizontal.
• Locate the roughing pump is located in an area where the
ambient temperature is 12 to 40 ºC (54 to 104 ºF).
• To ensure proper ventilation, install the pump with the
following minimum clearances:
Warning:
The roughing pump is heavy. To avoid injury, at least
two people must lift the pump.
TP03165
Left side minimum clearance
is 15.24 cm (6 inches)
Right side minimum clearance
is 15.24 cm (6 inches)
Front side minimum clearance
is 35.56 cm (14 inches)
Back side minimum clearance
is 15.24 cm (6 inches)
Содержание Xevo TQ MS
Страница 10: ...x...
Страница 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Страница 129: ...Replacing the air filter 4 81...
Страница 130: ...4 82 Maintenance Procedures...
Страница 146: ...B 4 Materials of Construction and Compliant Solvents...
Страница 178: ...D 4 Plumbing the IntelliStart Fluidics system...