
3-6
Configuring the LockSpray Source
Removing the ESI probe
Required materials
Chemical-resistant, powder-free gloves
To remove the ESI probe:
1. Prepare the instrument for working on the source (see
2. Disconnect the fluidics tubing from the ESI probe.
3. Disconnect the ESI probe’s cable from the high voltage connector.
4. Unscrew the probe locking ring.
5. Carefully remove the ESI probe from the probe adjuster assembly.
6. If available, fit the protective sleeve to the ESI probe tip.
Warning:
The LC system connections, ESI probe, and source can
be contaminated with biohazardous and/or toxic materials. Always
wear chemical-resistant, powder-free gloves while performing this
procedure.
Warning:
To avoid electric shock, ensure that the instrument is
prepared for working on the source before commencing this procedure.
Warning:
The ESI probe tip is sharp. To avoid puncture wounds,
handle the probe with care.
Содержание Xevo G2 QTof
Страница 10: ...x...
Страница 18: ...xviii Table of Contents...
Страница 34: ...1 16 Waters Xevo G2 QTof Overview...
Страница 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Страница 108: ...5 32 Maintenance Procedures 2 Slide the collar to the end of the tool 3 Insert the collar in the sample cone Collar...
Страница 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Страница 238: ...B 28 External Connections...
Страница 242: ...C 4 Materials of Construction and Compatible Solvents...
Страница 248: ...Index 6...