
5-36
Maintenance Procedures
Assembling the sampling cone assembly
Required materials
Chemical-resistant, powder-free gloves
To assemble the sampling cone assembly:
1. Fit the cone gas nozzle handle to the cone gas nozzle and turn the handle
clockwise to tighten.
2. Carefully fit the sample cone into the cone gas nozzle.
3. Fit the O-ring (a new one, if you disposed of the old O-ring) into the
groove created between the sample cone and cone gas nozzle.
Fitting the sampling cone assembly to the source
Required materials
Chemical-resistant, powder-free gloves
Caution:
• To avoid recontaminating the sampling cone assembly, wear clean
chemical-resistant, powder-free gloves during this procedure.
• The sample cone is fragile. Never place it on its tip; always place it on
its flanged base.
TP02663
O-ring
Sample cone
Cone gas nozzle
Cone gas nozzle handle
Содержание Xevo G2 QTof
Страница 10: ...x...
Страница 18: ...xviii Table of Contents...
Страница 34: ...1 16 Waters Xevo G2 QTof Overview...
Страница 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Страница 108: ...5 32 Maintenance Procedures 2 Slide the collar to the end of the tool 3 Insert the collar in the sample cone Collar...
Страница 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Страница 238: ...B 28 External Connections...
Страница 242: ...C 4 Materials of Construction and Compatible Solvents...
Страница 248: ...Index 6...