Starting Up and Shutting Down the Detector
11
1
Figure 1-7 Compression Screw Assembly
4. Seat one end of the column outlet tubing in the fitting of the column outlet, then
tighten the compression screw about 3/4-turn past finger-tight (using the 5/16-inch
open-end wrench).
5. Seat the other end of the tubing in the fitting of the detector inlet, then tighten the
compression screw as in step 4.
6. Seat the end of the detector outlet tubing with the compression fitting in the detector
outlet fitting, then tighten the compression screw about 3/4-turn past finger-tight.
Insert the other end of the tubing in the waste container.
1.6 Starting Up and Shutting Down the Detector
The entire startup procedure takes less than 1 minute. Once completed, you should allow
the 2996 Detector to warm up for at least 1 hour before running an analysis. Follow the
procedures in this section to ensure reliable detector performance.
Starting Up the Detector
To start up the 2996 Detector:
1. In your instrument method, set the solvent delivery system or pump to deliver
1 mL/min of degassed mobile phase. For details, refer to the Millennium
32
Help.
STOP
Attention:
To avoid damage to the flow cell, avoid pressures approaching its maximum
allowable pressure, 1000 psi (70 kg/cm
2
).
TP01139
Compression
Screw
Ferrule
End Must be Straight
and Smooth to Prevent
Dead Volume
Tubing
Distance Determined by
the Union or Column Fitting
Содержание 2996
Страница 1: ...Waters 2996 PDA Detector Operator s Guide 34 Maple Street Milford MA 01757 71500023202 Revision C...
Страница 14: ...xiv Table of Contents...
Страница 16: ...xvi List of Figures...
Страница 18: ...xviii List of Tables...
Страница 22: ...xxii...
Страница 36: ...14 Installation 1...
Страница 62: ...40 Principles of the 2996 PDA Detector Optics 4...
Страница 72: ...50 Spectral Contrast Theory 5...
Страница 74: ...52 Detector Specifications A...
Страница 76: ...54 Spare Parts B...
Страница 84: ...62 Index I N D E X...