Making fluid line connections
2-7
Requirement:
You must make the following fluid line connections on your
detector unit:
•
Column connections
•
Drip management system connections
Recommendations:
•
Before completing the column connections, perform the verification
procedures described in
.
•
Install a waste reservoir connected to the drain tube, located next to the
rubber foot on the front lower-left section of the detector.
•
Use Tygon
©
tubing to connect the drain tube to the waste reservoir.
Connecting columns
The fluid line connections to the detector are located in the front right-hand
side of the flow cell assembly (see the figure below).
To make the inlet and outlet tubing connections
1.
Attach the stainless steel compression fitting and ferrule (supplied in
the startup kit).
2.
Connect the inlet tubing to the column outlet. Ensure the tubing is
seated firmly, then tighten the compression screw.
3.
Connect the Tygon
tubing to the flow cell outlet tubing and route to a
waste container.
Caution:
The detector, as shipped, has a standard analytical flow cell
pressure-rated at 1000 psi. To prevent damage, do not connect any
tubing or device that might cause backpressure to exceed the
pressure rating of the tubing or flow cell.
Содержание 2489
Страница 8: ...viii...
Страница 32: ...1 16 Theory and Principles of Operation...
Страница 134: ...3 66 Preparing the Detector...
Страница 193: ...Warnings that apply to all Waters instruments A 9...
Страница 204: ...B 6 Detector Specifications...
Страница 220: ...D 14 Solvent Considerations...