
2-2
Setting up the Detector
Introduction
The following figure shows the major steps in installing the detector.
Major steps in installing the detector
Before you begin
Requirement:
To install the detector, you should know how, in general, to set
up and operate laboratory instruments and computer-controlled devices and
also how to handle solvents.
Make Signal
Connections to
Start installation
procedure
Installation
complete
Select
appropriate
site
Unpack and
inspect
Make power
connections
Make signal
connections to
other devices
Place 2424 ELS
detector in desired
location
Make liquid line
connections
Make waste and
venting connections
Make gas
connections
Fill siphon with
mobile phase
Install nebulizer
Содержание 2424
Страница 8: ...viii...
Страница 30: ...1 16 2424 ELS Detector Optics Principles...
Страница 64: ...2 34 Setting up the Detector...
Страница 110: ...3 46 Operating the Detector...
Страница 126: ...4 16 Maintaining the Detector...
Страница 182: ...A 14 Safety Advisories...
Страница 186: ...B 4 Specifications...
Страница 196: ...Index 10...