background image

8

Copyright © 2021, Waterite, Inc.  All Rights Reserved

SECTION 2: SYSTEM OPERATION

2.1. System Controller

Standby/ON Switch

Capacitive touch switch. Tank Full LED turns Red to confirm button contact. To switch to states, hold for 1-2 seconds.

Manual Mode

Press and hold ON switch for 3-5 seconds will activate manual mode. Unit will run for 5 minutes then turn off.

2.2. Controller Programs

The controller has 2 separate user-selectable settings for configuring the RO. The settings are identical except for variations in 

the membrane flush procedure. If your feed water is a municipal water supply use program 1 as you are starting with clean and 

treated water. If your feedwater has high TDS, Program 2 is recommended as it will increase membrane life. It will also increase 

water consumption.

Program 1, No Flush (Default, Preset at factory)

Program 2, Auto Flush (Option)

Figure 7

RO Program Settings

Switch 1

Switch 2

Program

ON

OFF

1

OFF

ON

2

Figure 8

Содержание Vectamaxx RSL

Страница 1: ...OWNER S MANUAL Vectamaxx RSL and RSLHP Commercial RO Systems Manufactured by WATERITE INC 5 200 Discovery Place Winnipeg MB R2R 0P7 www waterite com...

Страница 2: ...intenance 12 3 1 Pre Filter Maintenance 12 3 2 Pre Filter Replacement 12 3 3 Membrane Service Life 12 3 4 Membrane Removal 13 3 5 Membrane Installation 13 3 7 Monitoring System Performance 14 3 8 Auto...

Страница 3: ...ll be available during the Pretreat regeneration cycle This will prevent the system from operating periodically with untreated feed water and prolong the life of the filter and membranes How can I get...

Страница 4: ...mum water level in the tank make sure that a check valve is installed in the product water line between the RO unit s outlet and the tank inlet This will ensure that backpressure from the tank will no...

Страница 5: ...n a location that has access to 230 208VAC power a feed water line a drain capable of handling the waste flow from the machine and close to the storage tank 3 Make sure the feed water source is capabl...

Страница 6: ...elements 1 Remove the filter housing by turning counterclockwise with the housing wrench supplied Figure 4 2 Inspect O ring for damage and to make sure it is seated correctly Figure 5 3 Remove plastic...

Страница 7: ...e is not present the distribution system can back feed the system and leak to drain damaging membrane Figure 3 1 6 Complete the Electrical Connection 1 Connect 12 ga minimum 3 wire cable from the cont...

Страница 8: ...er Programs The controller has 2 separate user selectable settings for configuring the RO The settings are identical except for variations in the membrane flush procedure If your feed water is a munic...

Страница 9: ...from the system close the Reject valve Figure 10 until you have a flow rate of 5 GPM Let the system operate for about 5 minutes with Recycle valve fully open 9 The system is now flushing preservative...

Страница 10: ...You may wish to lock the valves in the proper position by removing the handles to discourage tampering 5 Your system is now set up to operate at its designed settings RSLHP Units 1 Slowly close the re...

Страница 11: ...may do so though this must be accomplished by a combination of increasing the flow of concentrate to waste and reducing the recycle valve flow This done in balance will maintain the overall system pre...

Страница 12: ...e 6 Dry thoroughly with clean lint free cloth or compressed air 7 Inspect O ring for damage and verify it is seated correctly Figure 4 8 Remove all plastic wrapping from filter cartridge Insert the ne...

Страница 13: ...on membrane housing s Down Flow Membranes 1 Remove plastic wrapping packaging from the membrane element s 2 Lightly lubricate the membrane brine seal and all O rings located in the membrane housing ca...

Страница 14: ...power 16 Perform system startup and flush procedure See 2 4 System Startup and Flush Procedure 17 Inspect system for leaks MEMBRANES ARE SHIPPED WITH AN ANTI BACTERIAL PRESERVATIVE OPERATE THE SYSTEM...

Страница 15: ...ing power supply automatically adjusts to supply voltage Voltage applied to the input is the same voltage the motor and valves will operate on Relay output ratings Feed solenoid 2A Output Voltage is t...

Страница 16: ...Requirements 230 208V 230 208V 230 208V 230 208V 230 208V 230 208V 230 208V 230 208V 6 4 7 1A 6 4 7 1A 10 3 11 3A 10 3 11 3A 10 3 11 3A 10 3 11 3A 10 3 11 3A 10 3 11 3A 120V Option Canada only Yes Ye...

Страница 17: ...essure Recycle valve out of adjustment See Step 2 5 Plugged or restricted recycle valve Clean or replace Crimped or damaged product line Repair or replace product line Membranes fouled Clean or replac...

Страница 18: ...opyright 2021 Waterite Inc All Rights Reserved SECTION 6 ELECTRICAL INFORMATION Motor Service factor all units Amps x 1 30 ALL RSL AND RSLHP UNITS ARE WIRED 230 208VAC 1 PH 60HZ UNLESS OTHERWISE SPECI...

Страница 19: ...19 Copyright 2021 Waterite Inc All Rights Reserved Figure 19...

Страница 20: ...off Switch N O FRG22 ALL 4 2 Pressure Gauge 0 100 psi LDU10025 ALL 5 2 Pressure Gauge 0 200 psi LDU20025 RSL 6 2 Pressure Gauge 0 300 psi LDU30025 RSLHP 7 Pre filter Housing Wrench HAN13W ALL 8 Produ...

Страница 21: ...21 Copyright 2021 Waterite Inc All Rights Reserved...

Страница 22: ...yright 2021 Waterite Inc All Rights Reserved SECTION 8 SYSTEM PERFORMANCE LOG Date Line Pressure System Pressure Permeate TDS Feed Water TDS Pre Filter Change Fast Flush Permeate Flow Meter Waste Flow...

Страница 23: ...23 Copyright 2021 Waterite Inc All Rights Reserved THIS PAGE HAS BEEN LEFT INTENTIONALLY BLANK...

Страница 24: ...nsibility is limited to any warranty carried by the manufacturer It is the dealer s responsibility to immediately notify Waterite if defects are detected Seller shall not be liable for any special inc...

Отзывы: