8
Fastened Footing
The array post base is designed with the option to be bolted to pre-set bolts in a concrete floor or
block if desired.
Position post over bolts and tighten down.
Attach post top to post base with 4 bolts/nuts/washers provided.
Continue to Array Build
200mm pre-set
anchor bolts, or
sleeve anchor
bolts
or(minimum)
Содержание MAXI ARRAY
Страница 1: ...Array Frame Installation MAXI ARRAY...