in order to speed up, you can test the OPS in a low level position, so
not too much water is needed before the autostop waterlevel is reached
open
the valve in the hose between
PAUL
®
and the FWT
open the valve in the connection between RWT and
PAUL
®
unit
PAUL
®
slowly is filled. If present, make sure to enable the LWS, so you
can also check its function right now
You can observe the water level rising in the transparent side outlet
hose
After some time close in the hose between
PAUL
®
and the FWT
This is to check whether the OPV in
PAUL
®
is working properly. After
successful test (please listen to the water flowing into
PAUL
®
. This gen-
tle sound must disappear without water overfilling
PAUL
®
), open it
again
fill FWT (without tapping water) and check whether the SV in the FWT inlet
closes properly when the FWT is full (this will take some time depending
upon the volume of the FWT, but the
PAUL
®
station
can be left unat-
tended during this test)
remember
not to drink the first 200 Liter
of water as there might be a
sweet taste from glycerine (which is not harmful!) which is used to preserve
new membranes and which will be flushed out during the
first
usage.
5.3 Temporary stop of operation
If the operation of
PAUL
®
station
must be stopped for a short time (e.g. some
hours, some days, but not several weeks), then please stop the process by
first
closing the valve in the hose between
PAUL
®
and the FWT
. This assures
that
PAUL
®
is filled with water during pause, which is necessary. Observe the
water level in the side outlet transparent hose. Water level inside
PAUL
®
should
be at least half the height of
PAUL
®
.
Then, all other necessary steps (switching off machines, closing taps etc.) can
be done.