background image

Model MSB2 

©Copyright 2017 IDEX AODD, Inc.  All rights reserved.

Table of Contents

Principle of Operation ............................................................................................ 1
Installation and Start-Up ........................................................................................ 1
Air Supply .............................................................................................................. 1
Air Inlet & Priming .................................................................................................. 2
Air Valve Lubrication .............................................................................................. 2
ESADS+Plus

®

: Externally Serviceable Air Distribution System ................................ 2

Air Exhaust ............................................................................................................ 3
Between Uses ....................................................................................................... 3
Check Valve Servicing ........................................................................................... 3
Diaphragm Servicing ............................................................................................. 3
Reassembly ........................................................................................................... 4
Pilot Valve .............................................................................................................. 4
Pilot Valve Actuator ................................................................................................ 4
Service Instructions: Troubleshooting ................................................................4-5
Warranty ................................................................................................................ 5
Installation ............................................................................................................. 6
Material Codes ...................................................................................................... 7
Composite Repair Parts List ...............................................................................8-9
Composite Repair Drawing.................................................................................. 10
CE Declaration of Conformity - Machinery .......................................................... 11
CE Declaration of Conformity - ATEX .................................................................. 12

Warren Rupp, Inc  A Unit of IDEX Corporation •  P.O. Box 1568, Mansfield, Ohio 44902 USA 

 Telephone (419) 524-8388  •  Fax (419) 522-7867  •  warrenrupp.com 

SERVICE AND OPERATING MANUAL

Models MSB2 and MSB2-B

Ball Valve

Type 3

Mine/Construction Duty

 

 

II 2G c T5

II 2Dc T100°C

Содержание SANDPIPER MSB2

Страница 1: ...assembly 4 Pilot Valve 4 Pilot Valve Actuator 4 Service Instructions Troubleshooting 4 5 Warranty 5 Installation 6 Material Codes 7 Composite Repair Parts List 8 9 Composite Repair Drawing 10 CE Decla...

Страница 2: ...y conductive fluids or Explosive environment is prevented from entering the internal portions of the pump i e dry running For further guidance on ATEX applications please consult the factory When the...

Страница 3: ...rsed The air distribution valve spool is moved by an internal pilot valve which alternately pressurizes one side of the air distribution valve spool while exhausting the other side The pilot valve is...

Страница 4: ...ist in the Service Manual supplied with your pump If you need replacement or additional copies contact your local Warren Rupp Distributor or the Warren Rupp factory Literature Department at the number...

Страница 5: ...ses could dry out or settle out This could cause problems with valves and diaphragms at re start In freezing temperatures the pump must be drained between uses in all cases CHECK VALVE SERVICING Need...

Страница 6: ...lock the two diaphragm assemblies together Place remaining outer chamber on the open end and tighten down the securing fasteners gradually and evenly on both sides PILOT VALVE The pilot valve assembl...

Страница 7: ...eely C Diaphragm ruptured Air will escape out discharge line in this case D Blockage in diaphragm chamber preventing movement Shut off air supply and reopen after pressure is relieved PROBLEM Uneven d...

Страница 8: ...oning spills See illustration 3 at right CONVERTING THE PUMP FOR PIPING THE EXHAUST AIR The following steps are necessary to convert the pump to pipe the exhaust air away from the pump The air distrib...

Страница 9: ...E P D M Rubber Color coded BLUE 365 Neoprene Rubber Color coded GREEN 366 Food Grade Nitrile 368 Food Grade EPDM 370 Butyl Rubber Color coded BROWN 371 Philthane Tuftane 374 Carboxylated Nitrile 375...

Страница 10: ...8 425 Gasket Valve Body 1 13 360 010 425 Gasket End Cap 2 14 560 020 360 O Ring 6 15 031 012 000 Sleeve Spool Set 1 16 170 032 330 Capscrew Hex Head 8 17 170 045 330 Capscrew Hex Head 4 18 132 002 360...

Страница 11: ...900 003 330 Washer Lock 8 39 545 008 330 Nut Hex Not used on CI units 8 41 196 047 156 Chamber Outer 2 42 530 036 000 Muffler Exhaust 1 48 800 012 156 Base Strainer MSB2 A 1 49 518 044 156 Manifold Su...

Страница 12: ...Model MSB2 Page 10 msb2dl3sm REV0317...

Страница 13: ...98 A1 2009 Pumps and Pump Units for Liquids Common Safety Requirements to verify conformance 5 YEAR Limited Product Warranty Warren Rupp Inc Warren Rupp warrants to the original end use purchaser that...

Страница 14: ...knowledge apply to the listed equipment AODD Pumps and Surge Suppressors Technical File No 203104000 1410 MER AODD Air Operated Double Diaphragm Pumps EC Type Examination Certificate No Pumps KEMA 09A...

Отзывы: