background image

5 April 2019

 

Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.

 

All Dimension are in mm

………….

Copyright © 

 

4

 

Hearth & Plinth

 

FIREBOX INSTALLATION

 

HEARTH  & PLINTH CONSTRUCTION DETAILS

 

CAITEC

” 

TECHONOLGY—ROOM AIR REPLACEMENT

 

Caitec

"

 draws air from an external air source to ensure that the open fire has pre

-heated combustion air maximising efficiency while maintaining the home at con-
stant pressure equilibrium, reducing the risk of back drafting . 
Ensure that the cavity is vented to Outside fresh Air and the Warmington will take 
care of the rest. 2 x 100mm Diameter vent are required (Or equivalent to that.) 

Builder  to  supply  external  air  to  the  Cavity  and  the  “Warmington  Fire” 

takes care of the rest. 
 
NOTE : Point to consider regarding pressure differential. 

Visit the Warmington website www.warmington for 

Hebel

” 

instruction (PDF download). 

 

 

1.

 

All the dimensions are minimum.

 

2.

 

Fit  the  plinth  into  position.  If  installing  on  a  wooden  floor,  ensure  an  insulating  plinth  is  fitted  as  per  the 

specifications.  Ensure  the  plinth  is  elevated  to  allow  for  finishing  on  the  hearth.  (See  hearth  and  plinth    

details).

 

3.

 

Fit the firebox & cabinet into position.  Remove the cabinet top & bolt the firebox to the plinth or through to 

the floor with the bolting points provided on the left and right hand sides of the firebox (seismic restraints).

 

4.

 

Ensure that Hi Temp Sealant is used between the Fire and Adaptor. Bolt into position with the Bolts in the 

Left and Right Hand Sides of the Firebox.

 

5.

 

Install the Warmington Freestanding Flue System. (see page 8)

 

6.

 

Replace the top of the Freestanding cabinet. 

 

This is a general Installation guide only.  Contact a 

NZHHA Installer

” 

for installation advice.

 

Visit  www.homeheat.co.nz, choose 

members

” & 

pick your area & fire type (wood / gas etc).

 

Note: Hearth and Plinth Construction.

 

For combustible flooring an insulating hearth and plinth of 
75mm Hebel is required.

 

Plinth to be offset above hearth by the hearth finishing’s  ( e.g. 

tiles/granite/solid plaster/etc.

 

Raised hearth’s & plinth’s cantilevered must be adequately 

supported to take  the weight in accordance with the NZ    
Building Code. 

IMPORTANT NOTE: 

 

*Note: If Solid Plastering the Heat Cell Structure, it is recommended to use a fibreglass mesh with a Latex Based Plaster to 
minimise the chance of the Solid Plaster cracking. (See your Solid Plasterer for correct materials and applications). 

This is a raised & cantilevered hearth. 

See page 15 for further raised hearth 

detail.

 

Содержание SI 780 FST

Страница 1: ...d current Installation details for the Warmington Fire Installation The Warmington unit is to be Installed by a Certified Warmington Installer or an Approved NZHHA Installation Technician See www home...

Страница 2: ...the land in relation to the home has a bearing on how the wind will interact with the fire and flue system Care needs to be taken to ensure that the flue termination is in the correct position to max...

Страница 3: ...950 1150 Cabinet Front Height J 625 705 775 825 Flue K 300 300 325 350 Inner Baffle L 350 350 375 400 Outer Liner 400 400 425 450 Heat Output kW Peak 24 26 32 35 Range 15 17 17 19 18 21 19 22 Estimate...

Страница 4: ...and plinth details 3 Fit the firebox cabinet into position Remove the cabinet top bolt the firebox to the plinth or through to the floor with the bolting points provided on the left and right hand si...

Страница 5: ...e place Caitec weir vent system as close to fireplace as possible CAITEC TECHONOLGY ROOM AIR REPLACEMENT Caitec draws air from an external air source to ensure that combustion air the open fire uses i...

Страница 6: ...335 Hearth Depth O 1910 1910 2060 2110 Hearth Width P 1200 1200 1350 1550 Hearth Projection Q 600 600 600 600 PLAN VIEW OF CABINET CLEARANCES STRAIGHT WALL HEARTH Adaptor fitment Seal adaptor to fireb...

Страница 7: ...1 4 9 1 6 NOTE The last length of flue pipe needs to extend past the liner so that when the top spide and flashing cone are fitted the flashing cone and the flue pipe are flush or that the flue pipe i...

Страница 8: ...ng Butynol Dek tite an additional flue pipe baffle is required All external air vents ceiling penetrations must be bird proofed with permanently fixed screens All flashing to comply with E2 All extern...

Страница 9: ...9 CHIMNEY CHASE FLASHING AND AIR VENTILATION OPTIONS VENTING THROUGH CHIMNEY CHASE VENTING THROUGH FLASHING No Insulation under flashing Insulation under flashing CHIMNEY CHASE FLASHING DETAILS Note...

Страница 10: ...Dimension are in mm Copyright 10 FLUE HEIGHT MINIMUM DETAILS FRAME OUT AND TRIM OUT DETAILS FOR CHIMNEY CHASE Option X Singled Lined Flue System Option Y Double Lined Flue System The flue exit is to c...

Страница 11: ...n mm Copyright 11 RAISED HEARTH CLEARANCES Note A minimum height must be maintained from the top of the cabinet to the ceiling See page 8 SI 780 1100 RAISED HEARTH CLEARANCES Note For combustible floo...

Страница 12: ...NGS WARNING ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE TESTING AUTHORITY IS CONSIDERED AS BREACHING AS NZS 4013 WARNING DO NOT USE FLAMMABLE LIQUIDS OR AEROSOLS TO...

Отзывы: