2.3 Fitting the Thermostat/Sensor.
Fit and seal the thermostat/sensor pocket to the product. See Section Figure 4 Connections.
Insert the thermostat/sensor into the thermostat/sensor pocket as shown in 5. Ensure the
sensor is secure.
Figure 5. Thermostat/sensor pocket.
3 COMMISSIONING
3.1 General Requirements.
Initial operation of the heating system must be done with the Installer of the heating system
or other competent person present.
As part of commissioning, the installer or other competent person must:
•
Ensure that adequate clearances and access to the installed product have been provided.
•
Ensure that all pipework is adequately supported.
•
Ensure that all connections to the buffer tank are correct.
•
Ensure that all connections are secure and leak-free. Tighten/correct all fittings as
appropriate.
•
Ensure that all air is vented from the product and wider heating system.
•
Ensure that the air vent fitted to the product is fully closed after venting has been
completed.
•
Explain to the User the mode of operation of the heating system and its buffer tank. All
documentation relating to the product must be provided directly to the User by the installer
with all aspects of the user warnings being fully explained (See section 1.4).