Programme settings
89
Adjusting programme settings
The programme settings should be adjusted to suit technical require-
ments and the load.
Additional specialist knowledge is required to alter programme set-
tings and this should therefore be undertaken only by experienced
users or by the W&H Customer Service Department.
Programme and dispensing changes must be documented for val-
idated processes. In Germany this is a requirement of the Medical
Devices Operator ordinance (MPBetreibV).
The process must be validated again as necessary.
Programme structure
Each programme is subdivided into programme blocks which run one
after another. A programme consists of at least one and a maximum
of eleven programme blocks. Each block can occur only once in a
programme.
The so-called programme header is placed above the programme
blocks and contains general programme settings. Individual wash
block parameters are also globally activated or deactivated here.
Programme
header
–
Change volume of water
Every programme block with water intake is allocated a nominal
water quantity. The water quantity can be raised or lowered incre-
mentally for all blocks to the base value in the programme chart.
–
Drain time
If the on-site waste water system is insufficient to drain the waste
water from the wash chamber within the time allocated, the drain-
age time can be lengthened by a set amount.
Parameters for measuring wash pressure and spray arm monitoring
can only be accessed by the W&H Customer Service Department.
Содержание teon + RID-200
Страница 2: ...2...
Страница 154: ...154 Enclosure...
Страница 157: ......
Страница 158: ......
Страница 159: ......