![Wallenstein WP245 Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/wallenstein/wp245/wp245_operators-manual_870840027.webp)
6.
Carefully fold the log loader chute down.
7.
Under the chute, hook the latch over the latch catch. Snap
the handle of the latch clamp into lock position. There is
one on each side.
8.
Crank the bracing jacks until the jack feet are firmly into the
ground.
9.
Carefully unfold the splitter chute.
10.
Adjust the splitter chute to the required height, using the
chute lock arm and placing the hitch pins in the appropriate
hole position.
11.
Unclip the winch hook from the log stabilizer chain.
12.
Check that the log stabilizer chain allows the stabilizer to
move freely and not hinder the log.
13.
Finally, adjust the splitter chute to the required height, crank
the bracing jacks so they are firmly on the ground, but
ensure the front lip of the lead in chute is on the ground (to
avoid catching on logs). If required, adjust the 3-point hitch
so the lead in chute is level with the ground and the bracing
jacks have a firm grip.
14.
Move the wagon, trailer, or conveyor into position under the
discharge chute.
The wood processor is now ready to work.
Fig. 24 –
Machine Set Up
12
8
11
WP245 / WP275
3-Point Hitch Firewood Processor
Operating Instructions
27