6.
Carefully fold the log loader chute down.
7.
Under the chute, hook the latch over the latch
catch. Snap the handle of the latch clamp into lock
position. There is one on each side.
8.
Crank the bracing jacks until the jack feet are firmly
into the ground.
9.
Carefully unfold the splitter chute.
10.
Adjust the splitter chute to the required height,
using the chute lock arm and placing the hitch pins
in the appropriate hole position.
11.
Unclip the winch hook from the log stabilizer chain.
12.
Check that the log stabilizer chain allows the
stabilizer to move freely and not hinder the log.
Log stabilizer
should pivot freely
at these points
Chain should be
free of kinks
Ensure lead in chute is
on the ground
Ensure Bracing
Jacks are Firmly in
Place
Fig. 22 –
Machine Set Up
12
8
11
Operation
WP240-WP270
3-Point Hitch Firewood Processor
36
Содержание WP240
Страница 1: ...OPERATOR S MANUAL 3 PointHitchFirewoodProcessor WP240 WP270 Part Number Z97115_OM W Rev Sep 2019...
Страница 19: ...WP240 WP270 3 Point Hitch Firewood Processor Safety Safety 19...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ...www wallensteinequipment com...