Alpha/Delta (Kinetic Operator) Installation and Maintenance Manual
Revision 1 - MAY 2023
117
PRELIMINARY TESTING
Preliminary Testing
All the control device inputs listed in Table 7 are shown as a single input. The second wire is connected to
a Common Terminal Bus (1 - 8) on the SmartDC Controller board.
The Fire Department Open input is an exception and requires a +24VDC input as well as activation through
the Installer Menu.
For convenience a +24VDC terminal is located next to the EMERG OPEN terminal. See
. Note that programming in the User or Installer Menu is required for
most connections.
Table 7. SmartDC Controller Board Inputs
Terminal
No�
Label/Input
Name
Wire Connection
Uses
1 - 8
Common
Terminal
All user inputs are energized when
connected to common except
Emergency Open.
All inputs except Emergency
Open.
9
Stop * push
button
Normally Closed (N.C.) input. Jumper
to Common if not being used.
Line of sight, external stop
button or 3-button station.
10
Open * push
button
Normally Open (N.O.) input. Not for
radio or remote access controls.
Line of sight, external open
button or 3-button station.
11
Close push
button
N.O. input. Connection for a close
push-button.
Line of sight, external close
button or 3-button station.
12
Remote Open
and Radio
Control**
N.O. input. For radio/remote open or
close device – Access the User Menu
and program RO RADIO OPEN/CLOSE.
Remote access control or
radio controls.
13
Partial Open
N.O. input. This input will cause the
gate to open to Partial Open position
programmed in the Installer Menu (7-
32ft).
Supervised access controls.
14
Sensor 2
N.C. input.
Connection of a Monitored
External Entrapment sensor. Type
of sensor used is programmable in
Installer Menu (S2).
External entrapment sensors.
Содержание ALPHA
Страница 36: ...36 wallaceperimetersecurity com Phone 866 300 1110 ALPHA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS ALPHA...
Страница 38: ...38 wallaceperimetersecurity com Phone 866 300 1110 ALPHA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS ALPHA...
Страница 40: ...40 wallaceperimetersecurity com Phone 866 300 1110 ALPHA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS ALPHA...
Страница 42: ...42 wallaceperimetersecurity com Phone 866 300 1110 ALPHA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS ALPHA...
Страница 44: ...44 wallaceperimetersecurity com Phone 866 300 1110 ALPHA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS ALPHA...
Страница 48: ...48 wallaceperimetersecurity com Phone 866 300 1110 DELTA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS...
Страница 50: ...50 wallaceperimetersecurity com Phone 866 300 1110 DELTA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS...
Страница 52: ...52 wallaceperimetersecurity com Phone 866 300 1110 DELTA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS...
Страница 54: ...54 wallaceperimetersecurity com Phone 866 300 1110 DELTA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS...
Страница 56: ...56 wallaceperimetersecurity com Phone 866 300 1110 DELTA GATE MODEL STEP BY STEP INSTALLATION DIAGRAMS...
Страница 167: ...Figure 47 Schematic for Kinetic DC 15 Kinetic 1 and Kinetic DC 10F Kinetic 2 Operator s...
Страница 168: ......
Страница 169: ...Figure 48 Schematic for Kinetic DCS 15 Kinetic 1S and Kinetic DCS 10F Kinetic 2S Solar Operator s...
Страница 170: ......
Страница 180: ......
Страница 182: ...115 Lowson Crescent Winnipeg Manitoba Canada R3P 1A6 Phone 866 300 1110 wallaceperimetersecurity com...