Specifications
4
Gas Supply Requirements
- Australia:
- New Zealand:
- UK Only:
Category:
II
2H3P.
Flue Type:
A
1.
*
Measure burner operating pressure at target top hob manifold test point with target top burner
(Inner and Outer Ring) operating at full setting. Operating pressure is ex-factory set through
appliance regulator and not to be adjusted, apart from when carrying out gas conversion, if
required. (Refer to ‘Gas Conversion’ section for details).
Natural Gas
LP Gas (Propane)
Input Rate (N.H.G.C.)
45 MJ/hr
45 MJ/hr
Gas Supply Pressure
1.13 - 3.40 kPa
2.75 - 4.50 kPa
Burner Operating Pressure (*)
1.0 kPa
2.60 kPa
Gas Connection
3
/
4
” B.S.P. Male
Natural Gas (G20)
Propane (G31)
Heat Input (nett)
Nominal
11.5 kW
11.5 kW
Reduced
4.7 kW
7.9 kW
Gas Rate (nett)
Nominal
1.22 m
3
/hr 0.89
kg/hr
Reduced
0.50 m
3
/hr 0.61
kg/hr
Supply Pressure
20 mbar
37 mbar
Burner Operating Pressure (*)
9.9 mbar
26.8 mbar
Gas Connection
3
/
4
” B.S.P. Male
Pilot
200W 200W
Pilot
0.02 m
3
/hr 0.02
kg/hr
Natural Gas
LP Gas
Input Rate (N.H.G.C.)
45 MJ/hr
45 MJ/hr
Gas Supply Pressure
1.13 - 3.40 kPa
2.75 - 4.50 kPa
Burner Operating Pressure (*)
1.0 kPa
2.60 kPa
Gas Connection
3
/
4
” B.S.P. Male
Содержание RNB8110GE
Страница 9: ...Dimensions 7 RN L 8110GE GEC ...
Страница 21: ...Wiring Schematic 19 RN8110GE ...
Страница 22: ...Wiring Schematic 20 RN8110GEC ...
Страница 23: ...Wiring Schematic 21 Wiring Layout for Static Oven Wiring Layout for Convection Oven ...
Страница 32: ......