![WAGO 762-1057 Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/wago/762-1057/762-1057_manual_868379030.webp)
30
Commissioning
WAGO-PERSPECTO® 762
762-1057 WP 57 QVGA
Manual
Version 1.4.0
Pos: 60 /All e Seri en (Allgemei ne Module)/Ü berschriften/N eue Ü berschriften/Ebene 1In Betrieb nehmen - Überschrift 1 @ 4\mod_1240901452750_21.docx @ 31570 @ 1 @ 1
6
Commissioning
Pos: 61 /Serie 762 (PERSPEC TO und e!DISPLAY)/In Betrieb nehmen/Einschalten @ 9\mod_1294213097437_21.docx @ 67860 @ 2 @ 1
6.1
Switch on
After applying the power supply, the device switches on automatically.
After the boot and self-test phase that lasts about 10 seconds, the programs set in
the WAGO Control Center (e.g. HMI runtime) are launched automatically.
To stop the programs and Windows CE desktop for configuring the panels from
launching automatically, the touch screen must be touched within a adjustable
time period (default setting 3 s) after the boot & self-test phase.
The service switch on the back of the device can be used to launch the Windows
CE desktop at any time.
The WAGO Control Center can be used to change the start behavior of the device.
Time window for launching the Windows CE desktop!
The WAGO Control Center can be used to set the time window for launching the
Windows CE desktop after the boot and self-test phase.
If the time is set to 0, the Windows CE desktop can only be launched by the
service switch.
Pos: 62 /D okumentation allgemei n/Glieder ungselemente/---Seitenwechsel--- @ 3\mod_1221108045078_0.docx @ 21810 @ @ 1