Operation
Preparing the Machine for First Use 6.1
31
[en-US] | 09/2022 | 5100061327 | RTLx-SC3 | Operator’s Manual
6
Operation
6.1
Preparing the Machine for First Use
Requirement
Machine on level surface
Procedure
1.
Remove all loose packaging materials from the machine.
2.
Check the machine and its components for damage. If there is visible
damage, do not operate the machine. Contact the dealer immediately
for assistance.
3.
Take inventory of all items included with the machine and verify that all
loose components and fasteners are accounted for.
4.
Connect component parts not already attached.
5.
Add fluids as needed and applicable, such as fuel, engine oil, and hy-
draulic oil.
6.
Move the machine to its operating location.
6
Содержание RTLx-SC3
Страница 6: ...This page is intentionally left blank...
Страница 89: ...Index 89 en US 09 2022 5100061327 RTLx SC3 Operator s Manual...
Страница 92: ...Cette page est laiss intentionnellement vierge...
Страница 183: ...Index 183 fr 09 2022 5100061327 RTLx SC3 Notice d utilisation...
Страница 184: ......
Страница 185: ......