
Operation
LB 1
wc_tx000741gb.fm
12
2.4
Assembling the Balloon to the Tripod
Prerequisites
Tripod
Procedure
Follow the procedure below to assemble the balloon to the tripod.
1. Lift the balloon and insert the end of the round shaft into the tripod receptacle
(a)
. Tighten the receptacle clamp.
2. Ensure that each carabiner
(b)
moves freely and is not jammed.
3. Each of the three support ropes
(c)
is provided with a loop on both ends. Attach
a support rope to each carabiner. Let the free ends of the ropes hang loosely for
the moment.
This procedure continues on the next page.
WARNING
Electric shock hazard. Electric shock can cause serious injury or death.
f
Never connect the light to its power source and never turn it on until it has been
fully unpacked and assembled to the tripod!
a
b
c
wc_gr005065