Use and operation
26
9
Use and operation
9.1
Prior to starting the machine
After unpacking, the machine is ready for operation.
Checking the machine
f
Check the machine and all components for damages.
Checking the mains
f
Check if mains or power distribution on the construction site have the correct
operating voltage (see nameplate of the machine or chapter
Technical Data
).
f
Check if mains or power distribution on the constructions site are protected
in accordance with current standards and regulations.
Only FUE 6...SC
When connecting internal and external vibrators.
Note:
Please also refer to the operator's manual of the internal vibrators/ex-
ternal vibrators.
Applicable to inverters with frequency adjustment:
f
During the operation of internal vibrators, set the thumbwheel to the maxi-
mum output frequency (highest number must be visible).
f
During operation of external vibrators, use the thumbwheel to search the re-
quired output frequency.
The output frequency affects the speed of the connected machines.
WARNING
Improper handling can result in injury or serious material damage.
f
Read and follow all safety instructions of this operator's manual, see chapter
Safety
.
Содержание FUE Series
Страница 1: ...Operator s manual Converter FUE KTU 03 2011 0227699en 002...
Страница 2: ......
Страница 44: ...15 Glossary 44...
Страница 46: ......
Страница 47: ......
Страница 48: ......