20
Operation
FUE 6
7
Operation
7.1
Prior to starting the machine
After unpacking, the machine is ready for operation.
Plug
The machine comes with a country-specific plug as a standard equipment.
Checking the machine
f
Check the machine and all components for damages.
Checking the mains
f
Check if mains or power distribution on the construction site have the correct
operating voltage (see nameplate of the machine or chapter
Technical Data
).
f
Check if mains or power distribution on the constructions site are protected
in accordance with current standards and regulations.
Connecting internal or external vibrators
Applicable to inverters with frequency adjustment:
f
During the operation of internal vibrators, set the thumbwheel to the maxi-
mum output frequency (highest number must be visible).
f
During operation of external vibrators, use the thumbwheel to search the re-
quired output frequency.
The output frequency affects the speed of the connected machines.
WARNING
Improper handling can result in injury or serious material damage.
f
Read and follow all safety instructions of this operator's manual, see chapter
Safety information
.
0212683
Содержание FUE 6
Страница 1: ...Inverter FUE 6 0213321en 002 05 2008 Operator s manual...
Страница 2: ......
Страница 32: ......
Страница 35: ......
Страница 36: ......