BA E16 en* 1.0 * E16_10_400.fm
4-37
Putting into operation
4
Requirements and information for the operating personnel
The vehicle may only be put into operation by authorized personnel that
has been instructed
– see chapter “2.3 Conduct” on page 2-3
.
The operator must know and bear in mind the requirements and risks at
the work place.
Perform daily maintenance according to the lubrication and maintenance
plan
– see chapter “7.2 Maintenance overview” on page 7-2
Do not operate the vehicle if the standard protective equipment (for
example the cabin) has been removed.
No clothes or parts of the body may protrude outside the vehicle during
operation.
Putting into operation for the first time and running-in period
Before putting the vehicle into operation for the first time, check whether
the equipment supplied with the vehicle is complete.
• Check the fluid levels according to chapter “
Maintenance
”.
Each vehicle is correctly adjusted and checked before it is delivered.
Handle the vehicle carefully during its first 50 operating hours.
• Do not load a cold engine.
• Warm up the vehicle at low engine speed and little load, do not warm it
up at a standstill.
• Do not change engine speed abruptly.
• Avoid using the vehicle under heavy loads or at high speeds.
• Avoid abrupt acceleration, braking and changing travel direction.
• Do not run the engine at high speed for extended periods.
• Observe the maintenance plans
Содержание ET35
Страница 14: ...1 8 BA E16 en 1 0 E16_10_100 fm 1 Foreword Notes...
Страница 46: ...3 8 BA E16 en 1 0 E16_10_300 fm 3 Introduction Warning labels Fig 9 symbolic representation...
Страница 51: ...BA E16 en 1 0 E16_10_300 fm 3 13 Introduction 3 Information labels Fig 25 symbolic representation...
Страница 57: ...BA E16 en 1 0 E16_10_300 fm 3 19 Introduction 3 ANSI label option Fig 43 symbolic representation...
Страница 64: ...3 26 BA E16 en 1 0 E16_10_300 fm 3 Introduction Notes...
Страница 194: ...6 8 BA E16 en 1 0 E16_10_600 fm 6 Transportation Notes...
Страница 204: ...7 10 BA E16 en 1 0 E16_10_700 fm 7 Maintenance Boom dozer blade 2 Fig 265 1 3 2 4 7 9 8 12 13 1 5 6 9 4 2 9 10 11...
Страница 252: ...8 8 BA E16 en 1 0 E16_10_800 fm 8 Malfunctions Notes...
Страница 279: ...BA E16 en 1 0 E16_10_900 fm 9 27 Technical data 9 16 Steel track additional weight long stick VDS...
Страница 285: ...BA E16 en 1 0 E16_10_900 fm 9 33 Technical data 9 32 Steel track additional weight long stick VDS...
Страница 288: ...9 36 BA E16 en 1 0 E16_10_900 fm 9 Technical data ET35 Cabin or canopy ET35 Cabin or canopy additional weight...
Страница 289: ...BA E16 en 1 0 E16_10_900 fm 9 37 Technical data 9 ET35 Cabin or canopy VDS ET35 Cabin or canopy additional weight VDS...
Страница 290: ...9 38 BA E16 en 1 0 E16_10_900 fm 9 Technical data EZ36 Cabin or canopy EZ36 Cabin or canopy additional weight...
Страница 291: ...BA E16 en 1 0 E16_10_900 fm 9 39 Technical data 9 EZ36 Cabin or canopy VDS EZ36 Cabin or canopy additional weight VDS...
Страница 292: ...9 40 BA E16 en 1 0 E16_10_900 fm 9 Technical data 9 15 Dimensions ET35 symbolic representation...
Страница 294: ...9 42 BA E16 en 1 0 E16_10_900 fm 9 Technical data EZ36 symbolic representation...
Страница 296: ...9 44 BA E16 en 1 0 E16_10_900 fm 9 Technical data Notes...
Страница 300: ...S 4 BA E16 en 1 0 E16_10_3SIX fm...