BA ET18, 20, 24 en* 1.5 * et18_20_24i400.fm
4-19
Putting into operation
4
Protective structures
Protective structures are additional elements that protect the operator or
user against hazards. These elements can be installed later on or as
standard equipment.
DANGER
Accident hazard due to modified cabin and protective structures!
Causes serious injury or death.
►
No drilling, cutting or grinding.
►
Do not install any brackets.
►
No welding, straightening or bending.
►
Replace the complete protective structure if it is damaged, deformed or
cracked.
►
Contact a Wacker Neuson service center in case of doubt.
►
Retrofit and repair work may only be performed by a Wacker Neuson
service center.
Information
Machine operation is only allowed with a correctly installed and intact
cabin or correctly installed and intact canopy.
For additional protection, only use correctly installed and intact Wacker
Neuson protective structures that have been released for the machine.
Information
Only a Wacker Neuson service center may install the protective structures
for the first time.
Responsibility for machine equipped with protective structures
The decision regarding the necessary protective structures (type and level
I or II) must be made by the machine owner and depends on the specific
work situation.
The machine owner must observe the national regulations and he must
inform the operator on the protective structure to be used in a specific
work situation.
Содержание ET12 02
Страница 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Страница 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Страница 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Страница 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Страница 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Страница 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Страница 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Страница 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Страница 177: ...BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 7 Transport 6 Fig 231Lashing points on either side outside on the travel gear A...
Страница 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Страница 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Страница 275: ...BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 43 Technical data 9 Cabin canopy standard travel gear and VDS...
Страница 276: ...9 44 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Dimensions Overview ET18 ET20 ET24...
Страница 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...