4-30
BA ET16 de* 1.0 * et16i400.fm
4 Putting into operation
4.4
Preparatory work
Important information before putting the machine into operation
Perform a visual check before starting work:
- There must be no leaks.
- There must be no damaged or loose parts.
- Do not allow anyone to stay in the danger zone.
Before putting the machine into operation, the operator must familiarize
himself with the position of the controls and instruments.
Only operate the machine from the seat with the seat belt fastened.
Before using the machine in work operation for the first time, Wacker
Neuson recommends trying out the machine on open ground without any
obstacles.
When using the machine, check the surroundings constantly in order to
identify potential hazards in time.
Before starting work, ensure that all visual aids are clean, functional and
adjusted in accordance with the instructions in this Operator’s Manual.
The operator must follow the national and regional regulations.
Perform a
functional check of the control lever base
.
Perform a
functional check of the safe load indicator
.
Do not make any modifications that impair visibility. The machine does not
meet the requirements for conformity and registration.
Follow the safety instructions in chapter
Safety 2.4
.
Requirements and information for the operating personnel
Read, understand and follow this Operator’s Manual and all other
Operator’s Manuals supplied with the machine.
The machine may only be put into operation by authorized personnel that
has been instructed. See chapter
“Safety 2.3”
.
The operator must know and bear in mind the requirements and risks at
the work place.
Perform daily maintenance according to the Lubrication and maintenance
plan (see chapter
“Maintenance 7.2”
)
Face the machine as you enter and exit it and only use the mandatory
climbing aids for entering and exiting.
Keep the footholds and the handholds clean to ensure a safe hold at all
times. Immediately remove contamination, oil, snow, etc.
Do not get on a moving machine, or jump off it.
Do not operate the machine if the standard protective equipment (for
example the cabin) has been removed.
No clothes or parts of the body may protrude outside the machine during
operation.
Содержание ET09-02
Страница 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Страница 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Страница 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Страница 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Страница 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Страница 84: ...4 24 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Cabin overview 2 11 13 7 10 1 12 5 8 16 14 15 4 6 9 3...
Страница 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Страница 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Страница 177: ...BA ET16 de 1 0 et16w700 fm 7 9 Maintenance 7 Lubrication plan 10 1 2 2 3 8 Fig 211 3 7 5 11 11 11 7 5 9 4 4 1 6...
Страница 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Страница 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...
Страница 246: ...S 4 BA ET16 de 1 0 et16en1_0SIX fm Index...