
BA EZ17 en* 1.1 * ez17i400.fm
4-27
Putting into operation 4
Putting into operation for the first time and running-in period
Before putting the machine into operation for the first time, check whether
the equipment supplied with the machine is complete.
• Check the fluid levels according to chapter “
Maintenance
”.
Each machine is correctly adjusted and checked before it is delivered.
Handle the machine carefully during its first 50 operating hours.
• Do not load a cold engine.
• Warm up the machine at low engine speed and little load, do not warm
it up at a standstill.
• Do not change engine speed abruptly.
• Avoid using the machine under heavy loads or at high speeds.
• Avoid abrupt acceleration, braking and changing travel direction.
• Do not run the engine at high speed for extended periods.
• Observe the maintenance plans
Содержание E13-01
Страница 6: ...EG 2 BA EZ17 en 1 1 ez17konf fm Declaration of conformity Notes...
Страница 36: ...2 22 BA EZ17 en 1 1 Safety_01_0 fm 2 Safety Notes...
Страница 45: ...BA EZ17 en 1 1 ez17e300 fm 3 9 Introduction 3 Warning labels...
Страница 50: ...3 14 BA EZ17 en 1 1 ez17e300 fm 3 Introduction Labels...
Страница 90: ...4 36 BA EZ17 en 1 1 ez17i400 fm 4 Putting into operation Notes...
Страница 158: ...5 68 BA EZ17 en 1 1 ez17b510 fm 5 Operation Notes...
Страница 216: ...7 50 BA EZ17 en 1 1 ez17w710 fm 7 Maintenance Notes...
Страница 220: ...8 4 BA EZ17 en 1 1 ez17b800 fm 8 Malfunctions Notes...
Страница 243: ...BA EZ17 en 1 1 ez17t900 fm 9 23 Technical data 9 Canopy without extra weight Canopy with extra weight Fig 241 Fig 242...
Страница 244: ...9 24 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Dimensions Fig 243...
Страница 246: ...9 26 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Notes...