
5-36
BA EZ17 en* 1.1 * ez17b510.fm
5 Operation
Setting down an attachment
1. Screw in the attachment and position it at 5 – 10 cm (2 – 4 in) above
the ground.
2. Shut off the engine and store the ignition switch key safely.
3. Turn the socket wrench
D
counter-clockwise until the bolts
E
are
completely retracted.
➥
The quick coupler system is unlocked.
4. Remove the socket wrench.
5. Start the engine.
6. Lower the attachment to level and firm ground ensuring stability.
7. Retract the bucket cylinder and quick coupler system
A
from the
attachment bolt
B
.
Fig. 128
Fig. 129
E
D
Fig. 130
B
A
Содержание E13-01
Страница 6: ...EG 2 BA EZ17 en 1 1 ez17konf fm Declaration of conformity Notes...
Страница 36: ...2 22 BA EZ17 en 1 1 Safety_01_0 fm 2 Safety Notes...
Страница 45: ...BA EZ17 en 1 1 ez17e300 fm 3 9 Introduction 3 Warning labels...
Страница 50: ...3 14 BA EZ17 en 1 1 ez17e300 fm 3 Introduction Labels...
Страница 90: ...4 36 BA EZ17 en 1 1 ez17i400 fm 4 Putting into operation Notes...
Страница 158: ...5 68 BA EZ17 en 1 1 ez17b510 fm 5 Operation Notes...
Страница 216: ...7 50 BA EZ17 en 1 1 ez17w710 fm 7 Maintenance Notes...
Страница 220: ...8 4 BA EZ17 en 1 1 ez17b800 fm 8 Malfunctions Notes...
Страница 243: ...BA EZ17 en 1 1 ez17t900 fm 9 23 Technical data 9 Canopy without extra weight Canopy with extra weight Fig 241 Fig 242...
Страница 244: ...9 24 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Dimensions Fig 243...
Страница 246: ...9 26 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Notes...