BA D18 us* 1.1 * D18b500.fm
5-1
Operation 5
5
Operation
Instrument panel cover
Before putting the machine into operation, open lock
A
with the starting
key and slide back instrument panel cover
B
until it locks into place.
Leave instrument panel cover
B
open during operation.
To lock instrument panel cover
B
, disengage it from the lock, close it and
lock it with ball handle
C
.
Tarp (option)
In the case of machines without cabin, the control stand can be protected
with a tarp.
Fasten tarp
A
with hooks
B
on the machine.
Fig. 100
B
A
Fig. 101
B
C
Fig. 102
A
C
Operation
Содержание DW100
Страница 18: ...1 8 BA D18 us 1 1 D18v100 fm 1 Foreword Notes...
Страница 46: ...3 8 BA D18 us 1 1 D18e300 fm 3 Introduction Warning labels Fig 9...
Страница 50: ...3 12 BA D18 us 1 1 D18e300 fm 3 Introduction Information labels Fig 20...
Страница 54: ...3 16 BA D18 us 1 1 D18e300 fm 3 Introduction ANSI label option Fig 36...
Страница 60: ...3 22 BA D18 us 1 1 D18e300 fm 3 Introduction Notes...
Страница 144: ...6 10 BA D18 us 1 1 D18t600 fm 6 Transportation Notes...
Страница 200: ...8 8 BA D18 us 1 1 D18b800 fm 8 Malfunctions Notes...
Страница 216: ...9 16 BA D18 us 1 1 D18t900 fm 9 Technical data 9 15 Dimensions Front skip overview...
Страница 218: ...9 18 BA D18 us 1 1 D18t900 fm 9 Technical data Swivel skip with rollbar overview...
Страница 220: ...9 20 BA D18 us 1 1 D18t900 fm 9 Technical data Swivel skip with cabin overview...
Страница 222: ...9 22 BA D18 us 1 1 D18t900 fm 9 Technical data...
Страница 226: ......
Страница 227: ......