![Wacker Neuson DV60 Скачать руководство пользователя страница 98](http://html1.mh-extra.com/html/wacker-neuson/dv60/dv60_operators-manual_3125742098.webp)
4-36
BA D24 en/us* 1.0 * D24_1_0_400.fm
4 Putting into operation
4.4
Preparatory work
Important information before putting the vehicle into operation
Perform a visual check before starting work:
- There must be no leaks.
- There must be no damaged or loose parts.
- Do not allow anyone to stay in the danger zone.
Only operate the vehicle from the seat with the seat belt fastened.
Before using the vehicle in work operation for the first time, Wacker
Neuson recommends trying out the vehicle on open ground without any
obstacles.
When using the vehicle, check the surroundings constantly in order to
identify potential hazards in time.
Before starting work or when changing operators, ensure that all visual
aids are clean, functional and adjusted in accordance with the instructions
in this operator’s manual.
The operator must follow the national and regional regulations.
Follow the safety instructions in the safety chapter
Requirements and information for the operating personnel
The vehicle may only be put into operation by authorized personnel who
have been instructed
– see chapter “2.3 Conduct” on page 2-3
.
The operator must know and adhere to the requirements and risks at the
workplace.
Perform daily maintenance according to the lubrication and maintenance
plan
– see chapter “7.2 Maintenance overview” on page 7-2
Do not operate the machine if the standard protective equipment (for
example the ROPS cab) has been removed.
Material stuck in the skip can cause a tipping hazard. Remove stuck or
frozen material from the skip with a suitable tool.
No parts of the body or clothes may protrude outside the machine during
operation.
Содержание DV60
Страница 8: ...EG 4 BA D24 en us 1 0 D24_1_0_konf fm Declaration of conformity...
Страница 16: ...1 8 BA D24 en us 1 0 D24_1_0_100 fm 1 Foreword...
Страница 47: ...BA D24 en us 1 0 D24_1_0_300 fm 3 7 Introduction 3 Warning labels Fig 9...
Страница 51: ...BA D24 en us 1 0 D24_1_0_300 fm 3 11 Introduction 3 Information labels Fig 21...
Страница 56: ...3 16 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction ANSI label option Fig 38...
Страница 62: ...3 22 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction...
Страница 97: ...BA D24 en us 1 0 D24_1_0_400 fm 4 35 Putting into operation 4 Enlarge camera image Abb 89...
Страница 108: ...4 46 BA D24 en us 1 0 D24_1_0_400 fm 4 Putting into operation...
Страница 140: ...5 32 BA D24 en us 1 0 D24_1_0_510 fm 5 Operation Notes...
Страница 150: ...6 10 BA D24 en us 1 0 D24_1_0_600 fm 6 Transportation Notes...
Страница 186: ...7 36 BA D24 en us 1 0 D24_1_0_710 fm 7 Maintenance...
Страница 207: ...BA D24 en us 1 0 D24_1_0_900 fm 9 17 Technical data 9 9 15 Dimensions...