4-18
BA D24 en/us* 1.0 * D24_1_0_400.fm
4 Putting into operation
Skip grid (option)
Skip grid
A
protects the cabin and the operator’s compartment against
falling material or against an excavator bucket penetrating the cabin
during loading.
Assembly:
1. Stop and park the vehicle. Stop the engine
2. Put the skip grid on the assembly points with at least two persons. Use
suitable external climbing aids.
3. Tighten the four screws
B
to 410 Nm (302 ft.lbs).
Lowering/raising the skip grid
The skip grid must be lowered during machine travel on public roads.
Fig. 79 Symbolic representation
A
Fig. 80
B
Fig. 81
Fig. 82
C
D
2
1
Function
Position
Fold-up
Insert and secure the pin in hole 1
Fold-down
Insert and secure the pin in hole 2
Содержание DV60
Страница 8: ...EG 4 BA D24 en us 1 0 D24_1_0_konf fm Declaration of conformity...
Страница 16: ...1 8 BA D24 en us 1 0 D24_1_0_100 fm 1 Foreword...
Страница 47: ...BA D24 en us 1 0 D24_1_0_300 fm 3 7 Introduction 3 Warning labels Fig 9...
Страница 51: ...BA D24 en us 1 0 D24_1_0_300 fm 3 11 Introduction 3 Information labels Fig 21...
Страница 56: ...3 16 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction ANSI label option Fig 38...
Страница 62: ...3 22 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction...
Страница 97: ...BA D24 en us 1 0 D24_1_0_400 fm 4 35 Putting into operation 4 Enlarge camera image Abb 89...
Страница 108: ...4 46 BA D24 en us 1 0 D24_1_0_400 fm 4 Putting into operation...
Страница 140: ...5 32 BA D24 en us 1 0 D24_1_0_510 fm 5 Operation Notes...
Страница 150: ...6 10 BA D24 en us 1 0 D24_1_0_600 fm 6 Transportation Notes...
Страница 186: ...7 36 BA D24 en us 1 0 D24_1_0_710 fm 7 Maintenance...
Страница 207: ...BA D24 en us 1 0 D24_1_0_900 fm 9 17 Technical data 9 9 15 Dimensions...