![Wacker Neuson DV60 Скачать руководство пользователя страница 136](http://html1.mh-extra.com/html/wacker-neuson/dv60/dv60_operators-manual_3125742136.webp)
5-28
BA D24 en/us* 1.0 * D24_1_0_510.fm
5 Operation
Maneuvering operation (option)
For pulling trailers in the construction site area, the vehicle has a
maneuvering coupling
A.
Pulling trailers is prohibited on public roads.
• The vehicle skip must be 25% filled in maneuvering operation. The
gross weight rating of the trailer and the contents of the skip may not
exceed the vehicle’s payload.
• Secure the pin
B
of the maneuvering coupling with a splint pin
C
.
• Secure the trailer to prevent it from rolling away (for example with
wheel chocks, blocks).
• Ensure that all lights and associated indicator lights are functional. The
plug receptacle
D
for the power supply of auxiliary units is located at
the rear of the vehicle.
NOTICE
Only attach the hitch to the maneuvering coupling.
Information
Observe the national and regional regulations.
Fig. 142
A
D
Payload
kg (lbs)
Skip contents
kg (lbs)
Gross weight rating
trailer kg (lbs)
braked with
DIN towing eye (F)
Gross weight rating
trailer kg (lbs) braked
with
ball coupling (E)
Gross weight rating
trailer kg (lbs)
unbraked with
DIN towing eye (F) or
ball coupling (E)
6000 (13,230)
1500 (3310)
3500 (7720)
1500 (3310)
750 (1650)
9000 (19,850)
2250 (4970)
3500 (7720)
1500 (3310)
750 (1650)
10,000 (22,050)
2500 (5520)
3500 (7720)
1500 (3310)
750 (1650)
Fig. 143 Symbolic photo
C
B
E
F
Содержание DV60
Страница 8: ...EG 4 BA D24 en us 1 0 D24_1_0_konf fm Declaration of conformity...
Страница 16: ...1 8 BA D24 en us 1 0 D24_1_0_100 fm 1 Foreword...
Страница 47: ...BA D24 en us 1 0 D24_1_0_300 fm 3 7 Introduction 3 Warning labels Fig 9...
Страница 51: ...BA D24 en us 1 0 D24_1_0_300 fm 3 11 Introduction 3 Information labels Fig 21...
Страница 56: ...3 16 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction ANSI label option Fig 38...
Страница 62: ...3 22 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction...
Страница 97: ...BA D24 en us 1 0 D24_1_0_400 fm 4 35 Putting into operation 4 Enlarge camera image Abb 89...
Страница 108: ...4 46 BA D24 en us 1 0 D24_1_0_400 fm 4 Putting into operation...
Страница 140: ...5 32 BA D24 en us 1 0 D24_1_0_510 fm 5 Operation Notes...
Страница 150: ...6 10 BA D24 en us 1 0 D24_1_0_600 fm 6 Transportation Notes...
Страница 186: ...7 36 BA D24 en us 1 0 D24_1_0_710 fm 7 Maintenance...
Страница 207: ...BA D24 en us 1 0 D24_1_0_900 fm 9 17 Technical data 9 9 15 Dimensions...