8 Operation and use
100_0202_op_0011.fm
27
8
Operation and use
8.1
Before commissioning
8.1.1
Inspection before commissioning
Open protective hoods
1. Pull hood opener of rear protective hood until it is unlocked. Completely open protective hood.
2. Pull hood opener of front protective hood until it is unlocked. Completely open protective hood.
Complete the following inspections:
Check the machine and components for damage. If there is any visible damage, do not use the
machine and immediately contact the Wacker Neuson service.
Ensure that loose packaging material has been removed from the machine.
Ensure that there are no loose items under the protective hoods, e.g. gloves or tools.
Check fuel level.
Check the engine oil level.
Check hydraulic oil level.
Check the fuel lines for leak tightness.
Check to ensure the screwed connections are firmly seated.
Ensure that the receiving units are free of dirt accumulation.
WARNING
Improper handling may result in injury or serious material damage.
Please read and follow all safety instructions in this operator's manual.
Item
Designation
Item
Designation
1
Hood opener of rear protective hood
2
Hood opener of front protective hood
NOTICE
Perform control procedures according to the
Maintenance
chapter. If necessary, top off
missing fuel, lubricants and coolants, see chapter
Technical Data.
1
2
Содержание DPU80 Series
Страница 74: ......