Maintenance
9.2 Maintenance plan
9.2
Maintenance plan
NOTICE
Danger of engine damage!
►
When commissioning new machines, an oil change must be carried
out once after 20 operating hours.
Maintenance work
daily
monthly
100 h
125 h
300 h
500 h
Clean the machine.
• Visual check for completeness.
• Visual check for damage.
●
Check engine oil fill level.
●
Check air filter intake area.
●
Check screw connections.
●
Check the fuel level
●
Clean and check air filter.
●
Check V-belt tension.
●
Cleaning the deposit cup.
●
Change engine oil.
●
Check spark plugs.
●
Clean fuel filter.*
●
Check rubber buffer .*
●
Check valve clearance.*
●
Replace fuel filter.*
●
* Have this work carried out by a service partner.
9.3
Maintenance work
Carrying out preparations:
1.
Place the machine on a level surface.
2.
Decommissioning the machine.
3.
Let the machine cool down.
9.3.1
Cleaning the machine
Observe the following when cleaning the machine with a high-
pressure cleaner:
1.
Do not aim high-pressure cleaner directly at air intake area and
electrical components.
2.
Do not hold the high-pressure cleaner too close to the machine in
order to avoid damage to labels and sensitive components.
40
Operator’s Manual | BPS1030A, BPS1135A, BPS1340A, BPS1550A, BPS2050A | BPS | 5100060577 | 01/2023 |
Version: 5 | [en]