![Wacker Neuson 803 dual power Скачать руководство пользователя страница 81](http://html1.mh-extra.com/html/wacker-neuson/803-dual-power/803-dual-power_operators-manual_866448081.webp)
OM 803 us – Edition 3.7 * 803b330.fm
3-27
Operation
Light system
The working light is located on the right on the boom.
The working light can be switched on with switch
A
as soon as the starting key
is in position “1”.
The switch has several positions and can be turned.
Therefore continue turning switch
A
by one notch to switch the working light on or off.
Information!
The Dual Power option includes a power-saving LED light
Power outlet
The control stand is equipped with a 12 V outlet on the right. This makes it possible to
operate a 12 V rotating beacon, for example.
NOTICE
There must be no consumer connected to the 12 V outlet during Dual-Power
operation.
•
The 12 V outlet may only be used during diesel operation, since the battery
is not charged during Dual-Power operation
Charging the excavator battery
Fig. 76: Light system
A
Fig. 77: 12 V outlet
Содержание 803 dual power
Страница 32: ...1 22 OM 803 us Edition 3 7 803b110 fm Introduction...
Страница 50: ...2 18 OM 803 us Edition 3 7 803b210us fm Safety instructions Check track tension at regular intervals...
Страница 54: ...2 22 OM 803 us Edition 3 7 803b210us fm Safety instructions...
Страница 184: ...5 44 OM 803 us Edition 3 7 803b560 fm Maintenance...
Страница 200: ...6 16 OM 803 us Edition 3 7 803b610 fm Technical data...