background image

       WACHS TRAV-L-VAC 300

10

PRE-VACUUM CHECKLIST:

1. Insure all scheduled maintenance has been

properly performed. See maintenance section
in manual or refer to maintenance decal on
TLV.

2. Insure that the hitch assembly has been

properly attached to the towing vehicle.

3. Check trailer brake lights and turn signals.

4. Check TLV-300 fuel level.

5. Make certain battery is charged and ready to start TLV-

300 engine.

6. Make certain suction hose and suction tubes are stored

on board TLV-300

7. Check drive belt tension. Adjust as necessary. (Refer to

drive belt tensioning diagram in Charts and Graphs
Section)

TRAV-L-VAC 300 SET UP PROCEDURE:

1. Position TLV system near work area.

2. Connect coupling of suction hose to coupling on vacuum

inlet port. ( Figure 1)

3. Connect coupling on suction hose to coupling on

suction tube.

4. Once assembly of these components is complete, unit

is ready for operation.

TRAV-L-VAC OPERATING PROCEDURE:

1. Start engine and allow to idle several minutes to properly

warm up. (Figure 2)

2. Ensure vacuum diverter valve is closed to achieve proper

suction through the suction hose. If diverter valve is open
no suction will be present at the wand opening.

3. Bring engine RPM up to full running speed.

4. Insert suction tube into valve box and drop down until

contact is made with either water or debris. Continue to

 SECTION IV

                             SET-UP AND OPERATION

Figure 1

Figure 2

Содержание TRAV-L-VAC 300

Страница 1: ...L VAC 300 TRANSPORTABLE VACUUM SYSTEM MODEL TLV 300 PIPE VALVE MAINTENANCE EQUIPMENT Model TLV 300 Ser No E H WACHS COMPANIES 100 Shepard St Wheeling Il 60090 Patent Pending E H Wachs Company 600 Kni...

Страница 2: ......

Страница 3: ...5 IV Installationprocedures 6 SETUP OPERATINGPROCEDURES I Beforedeparturetojobsite 7 II Trav L Vacsetupprocedure 7 III Trav L Vacoperatingprocedure 7 9 IV Liquiddebrisremoval 10 V Soliddebrisremoval 1...

Страница 4: ...maximum capacity 345 CFM 9 77 cmm 3600 RPM with 14 355 6 mm Hg 15 813 FPM 4 819 8 cmm air velocity through 2 50 8mm diam eter inlet FILTRATION Primary drum filter with 2 50 8 mm of polyethylene foam...

Страница 5: ...must be worn while operating or working near this tool CAUTION Personal hearing protection is recommended when operating or working near this tool 4 KEEP CLEAR OF ROTATING PARTS Keep hands arms and f...

Страница 6: ......

Страница 7: ...WACHS TRAV L VAC 300 7 SECTIONIV SET UP AND OPERATING PROCEDURES...

Страница 8: ...length to connect the tail lights 082 083 18 Strip the ends of the trailer wires 1 2 for proper connection 19 Feed the trailer wires through the upper slots on the fender braces 20 Push the stripped b...

Страница 9: ...WACHS TRAV L VAC 300 9 SECTION IV SET UP AND OPERATION INSTALLATION DIAGRAM...

Страница 10: ...aphs Section TRAV L VAC 300 SET UP PROCEDURE 1 Position TLV system near work area 2 Connect coupling of suction hose to coupling on vacuum inlet port Figure 1 3 Connect coupling on suction hose to cou...

Страница 11: ...TE If a clog occurs shake suction hose If clog remains openthevacuumdivertervalvetoremove vacuum from suction hose Disconnect the hose from the TLV Either use a ram to dislodge clogged debris or rever...

Страница 12: ...xcavating water always be sure to submerge the suction tube completely 2 If debris is packed in the bottom of the valve box rotate the suction tube assembly back and forth to break up debris 3 For sol...

Страница 13: ...WACHS TRAV L VAC 300 13 SECTIONV MAINTENANCE...

Страница 14: ...quivalent FILTER MAINTENANCE SCHEDULE DAILY Clean primary filter WEEKLY Clean pre filter NOTES Frequency of cleaning will increase under severe oper ating conditions All filters are washable with mild...

Страница 15: ...ssive debris build up Check lug nuts and fasteners for tightness Tighten as necessary MONTHLY Check blower drive belts for proper tension frayed or cracked condition Adjust or replace as needed Check...

Страница 16: ...WACHS TRAV L VAC 300 16 SECTIONV MISCELLANEOUS CHARTS AND GRAPHS...

Страница 17: ...WACHS TRAV L VAC 300 17 TRAV L VAC 300ACOUSTIC EVALUATION SOUND DECIBLE LEVEL DIAGRAM 10 FT...

Страница 18: ...WACHS TRAV L VAC 300 18 TRAV L VAC 300PERFORMANCE CHARTS...

Страница 19: ...WACHS TRAV L VAC 300 19 BILL OF MATERIAL...

Страница 20: ...1 2 HHCS 7 90 071 20 6 3 8 16 x 2 HHCS TRAV L VAC 300 BILL OF MATERIAL PART NO 59 000 01 59 401 01 REF PART NO QTY DESCRIPTION REF PART NO QTY DESCRIPTION 01 59 300 01 1 TLV FRAME 02 59 302 01 1 BLOW...

Страница 21: ...WACHS TRAV L VAC 300 21...

Страница 22: ...0 x 1 HHCS 14 90 051 07 2 1 4 20 x 3 4 HHCS 15 90 055 01 7 1 4 20 HEX NUT 16 90 055 52 7 1 4 LOCK WASHERS 17 90 055 53 6 1 4 FLAT WASHERS 21 90 065 52 4 5 16 FLAT WASHERS 22 90 065 51 7 5 16 18 LOCK W...

Страница 23: ...1 2 x 3 1 2 031 59 031 00 1 NIPPLE 2 1 2 x 7 032 59 032 00 1 NIPPLE 2 x CLOSE 050 62 050 00 1 BLOWER AIR 051 62 051 00 1 SILENCER AIR 052 62 052 00 1 VALVE KNUCKLE 058 62 058 00 1 TEE 2 1 2 060 62 06...

Страница 24: ...ber and a brief description of problem or work to be done or estimated All repair work done at our plant will be estimated and the customer advised of cost and time required to complete repair WARRANT...

Отзывы: