2 - 12
INSTALLATION
JUNE 2021
32DSKF02.D
TITANIUM S-SERIES AND K-SERIES
PUBLIC USE SERVICE MANUAL
RSM0003400
SET SCREW
S-SERIES TYPE PLATFORM
FIGURE 2-20: S/K-SERIES PLATFORM SET SCREWS
c.
Repeat steps a and b as required to achieve proper rollstop operation.
3.
K-SERIES PLATFORM FOLDING LINKAGE ADJUSTMENT
For K-Series with split platforms, the front portion of the platform is connected to the rear portion with a hinge. The
front portion is folded with linkages located at the right and left sides of the platform. The length of the linkage might
require adjustment after installation of the lift or after disassembly of the platform.
NOTE:
Perform the PLATFORM TILT ADJUSTMENT procedure before adjusting the linkage.
a.
Deploy and lower the platform to a position about halfway between floor level and ground level.
b.
Refer
to
Figure 2-21
. Inspect the gaps on both sides of the platform folding joints. The gaps must be uni-
form. If the gaps are not uniform, adjustment is required.
FIGURE 2-21: S/K-SERIES PLATFORM SET SCREWS
c.
Refer
to
Figure 2-22
. Loosen the jam nuts (right and left sides) and use the adjusters to set the length of
the linkages so that the front and rear portions are in the same plane; the two surfaces of the platform por-
tions must be flat without any apparent folding along the hinge.