SECOND GENERATION UNIT SHOWN (After April
2005 thru February 2015)
CURRENT PRODUCTION SHOWN (After February
2015)
5.
Reverse the procedure to install the replacement
gas valve.
NOTE:
Clean the pipe threads and apply pipe joint
compound to threads. Any pipe joint compound used,
must be resistant to the action of propane gases.
All gas joints disturbed during
servicing must be checked for leaks. Check with a
soap and water solution (bubbles). Do not use an open
flame.
6.
Verify gas pressure as outlined under GAS
PRESSURE ADJUSTMENT (for units before
February 2015) and GAS VALVE PRESSURE
CHECK (for units after February 2015) and check
for proper operation.
IGNITION CONTROL MODULE
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
SHUT OFF THE GAS BEFORE
SERVICING THE UNIT.
1.
NOTE:
If right side panel is not accessible, this
component can be serviced by removing the Control
Panel.
2.
Loosen the screws securing the mounting
bracket to the component panel and remove the
bracket.
Fig. 26
3.
Disconnect the lead wires and igniter cable from
the ignition module board.
VC4G & VC6G SERIES FULL SIZE CONVECTION OVENS - REMOVAL AND REPLACEMENT OF PARTS
F24682 Rev. D (1016)
Page 14 of 75
Содержание ML-126610
Страница 63: ...Fig 85 VC4G VC6G SERIES FULL SIZE CONVECTION OVENS WIRING DIAGRAMS Page 63 of 75 F24682 Rev D 1016...
Страница 65: ...Fig 87 VC4G VC6G SERIES FULL SIZE CONVECTION OVENS WIRING DIAGRAMS Page 65 of 75 F24682 Rev D 1016...
Страница 67: ...Fig 89 VC4G VC6G SERIES FULL SIZE CONVECTION OVENS WIRING DIAGRAMS Page 67 of 75 F24682 Rev D 1016...
Страница 69: ...Fig 91 VC4G VC6G SERIES FULL SIZE CONVECTION OVENS WIRING DIAGRAMS Page 69 of 75 F24682 Rev D 1016...
Страница 71: ...Fig 93 VC4G VC6G SERIES FULL SIZE CONVECTION OVENS WIRING DIAGRAMS Page 71 of 75 F24682 Rev D 1016...