background image

9.

Repeat average temperature calculation for up to
three attempts. Allow the cooking control to cycle
at least two times between adjustments before
performing the calculation.

10. If calibration is unsuccessful, cooking control

may be malfunctioning and cannot be adjusted
properly. Install a replacement cooking control
and check calibration.

HEATING ELEMENT TEST

 

MODEL

VOLTAGE

TOTAL KW

AMPS PER ELEMENT

OHMS PER

ELEMENT

CEF40

208 /3 Phase

17

13.5

15.5

240 / 3 Phase

11.6

20.5

480 / 3 Phase

5.8

82.3

CEF75

208 /3 Phase

24

19.2

10.8

240 / 3 Phase

16.7

14.4

480 / 3 Phase

8.3

57.6

NOTES:

1. Values in the table are nominal. Tolerance is +5/-10%.

2. Resistance values (ohms) are @ room temperature.

3. There are 

3

 elements per firebar, 

6

 elements per tank.

 

 Disconnect the

electrical power to the machine and
follow lockout / tagout procedures.

1.

Remove ELEMENT HEAD COVER .

 Heating elements must remain

submerged in shortening while performing this test or
damage may occur.

2.

Access heating element lead wire connections at
wire nuts.

3.

Re-connect power, turn power switch on and set
cooking control to call for heat.

4.

Measure voltage at heating element connections
and verify against data plate voltage.

A.

If voltage is incorrect, see
TROUBLESHOOTING (Table 11).

NOTE: 

This method is preferred over a resistance

check when a clamp on type amp meter is available.

B.

If voltage is correct, check current draw
(amps) through the heating element lead
wires. See table for proper values.

If current draw is correct, heating
element is functioning properly.

If current draw is incorrect, replace
HEATING ELEMENT

5.

Measure heating element resistance.

 Disconnect the

electrical power to the machine and
follow lockout / tagout procedures.

NOTE: 

 If unable to check current draw, a resistance

check may indicate a malfunctioning element.

A.

Turn power switch off and disconnect power
to machine.

B.

Allow heating elements to cool to room
temperature.

C.

Remove wire nuts from heating element
lead wire connections and separate lead
wires.

D.

Check resistance (ohms). See table for
proper values.

NOTE: 

 Resistance values are provided for elements

at room temperature.

6.

Restore operational condition and check for
proper operation.

CEF40/75 FRYER - SERVICE PROCEDURES AND ADJUSTMENTS

Page 15 of 25

F45657 (0517)

Содержание CEF40

Страница 1: ...procedure Procedures for which you do not have the necessary tools instruments and skills should be performed by a trained Vulcan Service Technician The reproduction transfer sale or other use of thi...

Страница 2: ...8 LIFT ASSIST SPRINGS 9 TEMPERATURE PROBE 10 HIGH LIMIT TEMPERATURE SWITCH 10 TILT SWITCH 11 CONTACTOR 11 TRANSFORMER 12 FUSE FUSE HOLDER 12 CIRCUIT BREAKER 12 SERVICE PROCEDURES AND ADJUSTMENTS 14 T...

Страница 3: ...BRICATION Refer to Lubrications Manual F20067 for current values CLEANING Refer to Operator s Manual F47660 for cleaning instructions located on Vulcan Resource Center at https my vulcanfeg com resour...

Страница 4: ...g 1 Fig 1 BULLNOSE Disconnect the electrical power to the machine and follow lockout tagout procedures 1 Remove fasteners and bullnose Fig 2 Fig 2 ELEMENT HEAD COVER Disconnect the electrical power to...

Страница 5: ...to the machine and follow lockout tagout procedures 1 Remove BULLNOSE 2 Rotate and lift to remove fryer door plate Fig 5 Fig 5 3 Disconnect harness from connector 4 Remove two screws Fig 6 Fig 6 5 Pu...

Страница 6: ...2 Remove control knob Fig 7 Fig 7 NOTE Wires do not have to be disconnected from relay 3 Remove nuts and relay Fig 8 Fig 8 4 Disconnect wires from CEF controller board Fig 9 Connector Wire Jx Switches...

Страница 7: ...assembly Fig 10 4 Reverse procedure to install 24V RELAY Disconnect the electrical power to the machine and follow lockout tagout procedures 1 Remove CONTROL BOX ASSEMBLY 2 Disconnect wires from relay...

Страница 8: ...d kink or clamp down on high limit switch probe capillary tube or damage may occur 1 If replacing left heating element A Remove nuts B Move temperature probe clamps 1 Fig 14 away from element Fig 14 2...

Страница 9: ...are to remain upright through entire procedure 1 Raise heating elements 1 Fig 16 and place 2x4 lumber 2 under them for support 2 Remove ELECTRICAL COVER 3 Remove screws and electrical panel 3 Fig 16...

Страница 10: ...rting temperature probe into element head assembly 7 Reverse procedure to install 8 Check TEMPERATURE CONTROL CALIBRATION HIGH LIMIT TEMPERATURE SWITCH Disconnect the electrical power to the machine a...

Страница 11: ...witch 9 Reverse procedure to install TILT SWITCH Disconnect the electrical power to the machine and follow lockout tagout procedures 1 Remove ELEMENT HEAD COVER 2 Disconnect tilt switch lead wires 3 R...

Страница 12: ...E FUSE HOLDER Disconnect the electrical power to the machine and follow lockout tagout procedures 1 Replace fuse A Remove fuse access cover B Remove fuse cap and fuse Fig 25 C Reverse procedure to ins...

Страница 13: ...Fig 26 3 Slide out circuit breaker retaining clips 4 Remove circuit breaker from chassis 5 Reverse procedure to install CEF40 75 FRYER REMOVAL AND REPLACEMENT OF PARTS Page 13 of 25 F45657 0517...

Страница 14: ...condition of temperature probe as outlined under TEMPERATURE PROBE TEST NOTE The level must be between MIN MAX fill lines before proceeding 2 Check shortening level in fry tank 3 Allow shortening to c...

Страница 15: ...wer turn power switch on and set cooking control to call for heat 4 Measure voltage at heating element connections and verify against data plate voltage A If voltage is incorrect see TROUBLESHOOTING T...

Страница 16: ...inue with procedure for adjustment 2 Adjust spring tension Take care when removing rear electrical cover as it can fall free and pull loose or damage wires A Remove ELECTRICAL COVER B Remove screws an...

Страница 17: ...s removed from temperature controller board This prevents heating elements from being energized when valve is open Heating Element Used to heat shortening Cycles on and off as to maintain desired temp...

Страница 18: ...COMPONENT LOCATION CEF40 75 FRYER ELECTRICAL OPERATION F45657 0517 Page 18 of 25...

Страница 19: ...CEF40 75 FRYER ELECTRICAL OPERATION Page 19 of 25 F45657 0517...

Страница 20: ...reakers CEF75 Only 7 Terminal Block 8 Transformer 9 Drain Valve Switch 10 Bullnose 11 Fryer Door Plate 12 Drain 13 Control Box Assembly 14 Operation Indicators 15 Tilt Switch 16 Temperature Sensor 17...

Страница 21: ...nds power to heat contactor coil and elements are powered 4 Shortening reaches set temperature A Controller de activates 24 VAC output from T5 via wire 56 to heat relay coil B Heat relay coil is dener...

Страница 22: ...8V 240V Item Nomenclature A Terminal Block B Terminal Barrier Strip C 3P 50A 230V Contactor D Rocker Switch Assembly D1 Rocker Switch Assembly Start G 24V DPDT Relay K Temperature Control N Thermistor...

Страница 23: ...tem Nomenclature A Terminal Block B Terminal Barrier Strip C 3P 50A 230V Contactor D Rocker Switch Assembly D1 Rocker Switch Assembly Start G 24V DPDT Relay K Temperature Control M 50A Circuit Breaker...

Страница 24: ...Item Nomenclature V 208 240V 24V 40VA Transformer X Control Box Power Harness Y Control Box Harness Z Tilt Switch CEF40 75 FRYER WIRING DIAGRAMS F45657 0517 Page 24 of 25...

Страница 25: ...activated 7 Fuse s open 8 Facility power removed from fryer 9 Transfomer failed 10 Heating element s failure 11 Tilt switch malfunction elements not fully lowered 12 Heat relay malfunction 13 Circuit...

Отзывы: