VULCAN
OPERATING
MANUAL FOR
BROILER/GRIDDLE
MODEL 100L-77R
VULCAN-HART CORPORATION, 3600 NORTH POINT BOULEVARD, BALTIMORE, MARYLAND 21222
Страница 1: ...VULCAN OPERATING MANUAL FOR BROILER GRIDDLE MODEL 100L 77R VULCAN HART CORPORATION 3600 NORTH POINT BOULEVARD BALTIMORE MARYLAND 21222...
Страница 2: ...installation of electrical wiring from the electric meter main control box or service outlet to the electric appliance Qualified installation personnel must be experienced in such work be familiar wit...
Страница 3: ...the outside of the building through a ventilation system installed by qualified personnel 6 For an appliance equipped with casters 1 the installation shall be made with a connector that complies with...
Страница 4: ...lly follow all of the instructions provided DESCRIPTION PAGE DEFINITIONS OF PERSONNEL Operating Installation Service and SHIPPING DAMAGE CLAIM PROCEDURE Inside Front Cover CAUTIONS 1 INDEX 2 OPERATING...
Страница 5: ...he main gas supply off BROILER OPERATION To preheat the broiler section turn the three manual gas valves to high After preheating turn the valves down to the desired heat setting Position the removabl...
Страница 6: ...MANUAL PART NO 113997 1 FOR MODEL 100L 77R DESCRIPTION BROILER GRIDDLE OPERATING MANUAL REV BLOCK REV DATE SIG 1 2 3 83 DML 2 3 12 82 DML...