background image

001

All rights reserved. 

Wszelkie prawa zastrzeżone.

Copyright © VTS sp. z o.o. 

Wszelkie prawa zastrzeżone.

Все права зарезервированы.

Installation of the AHU on site

STEP 1

AHU and CBX types:

Unpacking automation elements

STEP 2

VVS021c-150c

VVS005s-030s

!

Note
In case 

a

of outdoor installation of the Air Handling Units (VVSc range only):

    

All cables should be secured by means of flexible conduits.

    

Any auxiliary junction boxes must meet minimum protection degree for outdoor conditions.

Ver. 2020.03.06

Содержание Ventus VVS005s-030s

Страница 1: ...e STEP 1 AHU and CBX types Unpacking automation elements STEP 2 VVS021c 150c VVS005s 030s Note In case aof outdoor installation of the Air Handling Units VVSc range only All cables should be secured b...

Страница 2: ...0V Stop Start Stop Start Stop Start Stop Start G0 G A B GND CO2 G0 G A B GND HMI Basic G0 DI1 Fire al G0 B1 G0 B2 G0 T supply B3 G0 B5 T heater T room T outside 24V RS 485 Modbus RTU 24V RS 485 Modbus...

Страница 3: ...odbus RTU 24V RS 485 Modbus RTU NO NC NTC10k NTC10k NTC10k NTC10k G0 G A B GND VOC G0 G A B GND Reserve G0 G Y1 G0 G Y2 G0 G Y3 G0 Heating G0 DI4 G0 DI5 G0 Mode 1 DI6 Mode 2 Remote 24V RS 485 Modbus R...

Страница 4: ...G0 G Y1 G0 G Y2 G0 G Y3 G0 1 2 5 G0 G Y1 Cable 3x0 5mm 1 2 3 Terminal 1 Heater act 2 24V DC 0 10V DC 1 2 5 G0 G Y1 Cable 3x0 5mm 1 2 3 Terminal 1 Heater act 2 24V DC 0 10V DC 1 2 3 1 2 3 3 3a Main hea...

Страница 5: ...lobal al Stop Start Recovery 24V 0 10V Cooling 24V 0 10V G0 B1 G0 B2 G0 T supply B3 G0 B5 T heater T room T outside NTC10k NTC10k NTC10k NTC10k G0 B1 G0 B2 G0 B3 G0 B5 1 2 G0 B5 Cable 2x0 5mm 1 2 2 Te...

Страница 6: ...prawa zastrze one Electric heater G0 G Y1 G0 G Y2 G0 G Y3 G0 Heating 24V 0 10V Recovery 24V 0 10V Cooling 24V 0 10V G0 G Y1 G0 G Y2 G0 G Y3 G0 1 3 2 3 2 Make holes for power supply and control cables...

Страница 7: ...DC Control cable PreHeater ReHeater 7c Ver 2021 09 16 G 3 4 3 4 HE PowerBox Terminal X1 AHU Terminal 1 D01 5 X 5 6 6 G0 A1 7 DI2 A2 8 Y1 2 2 G0 1 1 D06 G0 DI2 A03 G0 G0 DI2 A04 G0 Hum DXH type G D06 G...

Страница 8: ...0 B2 G0 T supply B3 G0 B5 T heater T room T outside 24V RS 485 Modbus RTU 24V RS 485 Modbus RTU NO NC NTC10k NTC10k NTC10k NTC10k G0 G A B GND VOC G0 G A B GND Reserve G0 G Y1 G0 G Y2 G0 G Y3 G0 Heati...

Страница 9: ...GND Humidi Room G0 D01 G0 G A02 Pump G0 G0 A03 G0 A04 Dampers Reserve Reserve G0 D02 G0 D03 G0 Dampers D04 G0 D05 Heat 2 Cool 1 Cool 2 24V RS 485 Modbus RTU 24V RS 485 Modbus RTU Stop Start 24V 0 10V...

Страница 10: ...1 2 3 4 5S Terminal 1 HMI Basic 2 24V DC Modbus RS 485 G0 G A B GND CO2 G0 G A B GND HMI Basic 24V RS 485 Modbus RTU 24V RS 485 Modbus RTU G0 G A B GND G0 G A B GND GND 24V Rx G0 G A Cable 4x0 5mm Sh...

Страница 11: ...485 Modbus RTU 24V RS 485 Modbus RTU 24V 0 10V NO NC NO NC NO NC G0 DI2 Heater al NO NC G0 DI3 Cool al NO NC C6 D06 Global al Stop Start Recovery 24V 0 10V Cooling 24V 0 10V Humidity limiting sensor 1...

Страница 12: ...elkie prawa zastrze one Copyright VTS sp z o o Wszelkie prawa zastrze one Ver 2020 09 04 Power connection 13 Main swich Q0 PE 3 400V N L1 L2 L3 Cable out of delivery 1 230V L N Cable out of delivery P...

Отзывы: