4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Chapter 6: Testing & Startup
Page 76
6.2
Before beginning the Testing and Start-Up procedures
Follow the steps below to prepare the GREEN MACHINE and VST Control Panel for Testing & Start-Up
STEPS
DESCRIPTION
1.
Unlock the hasps and remove the cover on the GREEN MACHINE.
2.
Close the 3-way valve below the Pressure Sensor (the handle is horizontal).
3.
Close the three (3) ball valves between the GREEN MACHINE
and the vent risers.
Reference Figure 6-2.
4.
Remove the caps from the 3 tees.
Reference Figure 6-2
.
5.
Turn ON the GREEN MACHINE breaker at the Main Distribution Panel OR power is provided by the ESO
Relay.
6.
Turn the Power
Switch to the “ON” position located on the front of the
Control Panel.
7.
At the PLC Main Screen, push the Maintenance Screen button to access the Password Screen.
8.
Enter 878 at the Password Screen to access the Maintenance Screen. (The GREEN MACHINE will now
be in the Manual OFF mode.)
9.
Make sure the Maintenance Switch is ON at the VST Control Panel.
(The GREEN MACHINE cannot operate in the Automatic Mode when the Maintenance Screen is
showing regardless of the UST pressure.)
6.3
Post Installation Start-Up Tests
During post-installation testing, the GREEN MACHINE will use outside air (no gasoline vapor from the
USTs) to conduct these tests.
The following tests must be conducted in the order shown below to avoid damage to the equipment.
6.4
Bump Test
6.5
Functionality Test
6.6
Programming the Fuel Management System for the GREEN MACHINE Overfill Alarm
Relay
6.7
Test the Overfill Alarm on the GREEN MACHINE VST Control Panel:
6.7.1
The TLS-350 Overfill Alarm Connection
6.7.2
The TLS-450 Overfill Alarm Connection
6.7.3
The TLS-450 PLUS Overfill Alarm Connection
6.8
Changing the Date and Time Procedure
6.9
Submitting Appendix B and Verification CODE Retrieval
The final step in the installation process is to start up the GREEN MACHINE and get it field commission
ready. This final commissioning process requires a verification code that will be entered into the PLC.