4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Chapter 9: Replacement Procedures
Page 186
9.10.3
Installing a New Separator
See Figure 9-35.
1.
Wrap the pipe fittings with gasoline resistant PTFE tape, and install the pipe fittings into the
new separator.
2.
Place the new separator into position in the GREEN MACHINE.
3.
Re-install two 45° flare tubing connections.
CAUTION
: Do not use any thread sealing compound when assembling the 45° flare
nuts.
CAUTION
: When tightening the 45° flare nuts: Clamp the tube flare between nut and
nose body of the tube by screwing the nut on finger tight. Tighten with a wrench an
additional ¼ turn for a metal-to-metal seal.
4.
Put the cover on the GREEN MACHINE and lock the hasps.
5.
Remove the lock(s) and tags from the lockout-tagout.
6.
After the work is completed, turn ON power to the VST Control Panel. The GREEN MACHINE
is now operational.
Figure 9-35: Separator Fitting Orientation